New information after a voluntary report
Review an earlier notice as soon as knowledge and impact change.
CONFORMITY
MAINTENANCE
Starting position and test order
In the case of networked cooling monitors, the manufacturer detects a near-prone incident in the morning. The replacement warning prevents the impairment in the first case. After documented initial evaluation there are still no sufficient facts for a mandatory notification by the manufacturer.
14:20 UTC confirms product responsibility for the version concerned with a serious incident affecting the safety of an essential product function. The first voluntary information and new evidence of effect can be found in the same chronology.
Compare test data and consequences
First signal
- Scale
- Replacement warning prevents impairment
- Observation
- Almost an incident assessed
- Follow
- Voluntary track possible
New knowledge
- Scale
- Serious product effect demonstrated
- Observation
- Confirmation at 14:20 UTC
- Follow
- Lead your own mandatory lane
Transmission
- Scale
- Separate supporting documents and a clear reference
- Observation
- A joint process with two decisions
- Follow
- Check supporting documents per charge
When the new status changes the notification decision
Keep the voluntary transmission. Determine the mandatory notification from the new confirmed event.
Edit the test step by step
Identifying the first facts and role
Describe the missing product effect and the existing replacement function. Check a voluntary way with clear justification.
Testable evidence A dated initial decision with open test point for new effects.
The new observation refers to the mandatory trigger
Keep confirmed effect, knowledge to 14:20 UTC and the responsible manufacturer. Arrange Art. 14 to the actual reporting branch.
Testable evidence Checkable information with own reporting track.
Linking both transmissions in a comprehensible way
Secure the voluntary notice and the subsequent transmission separately. Include user protection and subsequent reporting levels.
Testable evidence Dated transmission protocol and concrete follow-up.
Worked decision and negative test
Decision in case
The information in the morning is voluntarily classified and transmitted in the sample. A mandatory trigger is confirmed around 14:20 UTC. From this time reference, the manufacturer checks immediate transmission, the applicable maximum period and subsequent stages.
The decision remains rewritten if the evidenced effects change. Already conducted evaluations and submitted versions remain comprehensible in the file.
Counter-sample and impact
Take the proof of a significant effect on the product function from the second observation. Evaluate the mandatory trigger again based on the remaining confirmed facts and name the next test step.
Templates and worksheets
Documenting information and new knowledge
Arrange near-prone, later confirmed effect and own transmission documents to time.
Outcome Renewable file with voluntary notice, confirmed mandatory reference and associated transmissions.
Read the instructions
Fictional example According to a voluntary notice, 14:20 UTC has its own mandatory trigger.
- Identify the starting situation Document the initial information and product reference.
- Run the test Match new knowledge and correct reporting track.
- Secure decision and evidence Prove transmission and follow-up to the right track.
Official sources
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Declarants and time limits for manufacturers
Separate the time-covers for active use and serious product incidents.
Central reporting platform for the CRA
Check the access, the reporting route and the location of the transmission document.
What depends on your result?
Coordinating voluntary advice and reassessment
Transfer the same test criteria to your own product and save the different starting data.
View the guideReporting route and deadlines
If the mandatory track is established, document the appropriate reporting levels and their respective final reference.
Check the reporting route and deadlines

