DORA · CASE STUDY

A restore misses its target

Evaluate time and data levels separately.

TASK
DECISION
RETEST
Fictional practice

Is the back-up enough for a professional release?

The fictitious port bank checks a backup for its payment service. They compare duration, data level and technical usability and derive from it an after-test.

You represent the department at the acceptance. Determine the completion of technical provision, time of professional usability and data level separately. Decide for each target criterion which observation it proves and what to repeat in the subsequent test.

Initial data of the exercise

Objectives of the exercise
Technically usable after a maximum of 90 minutes. The last confirmed data level may be no more than 15 minutes before the interruption.
First test
Technical provision after 80 minutes, technical usability after 105 minutes. The confirmed from the fuse stand is 11 minutes before interruption.
Finding
The technical comparison takes additional time. The measuring points in the plan already end with technical provision.

Tasks for processing

Keep track of your decision, the original document used and still open information. Only open the sample solution once you have documented your justification.

  1. Arrange each measurement result to the right time or data criterion.
    Acceptance criterion
    Use the same metric, population and unit for expected and observed results. Record the measurement point at which the business service is achieved.
    Evidence
    Measurement record with baseline population, source, expected and observed values, unit and timestamp.
  2. Decide and document the findings with the relevant role and a follow-up order.
    Acceptance criterion
    A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.
  3. Set measurement points for the follow-up run, which represent the actual completion of the technical examination.
    Acceptance criterion
    Use the same metric, population and unit for expected and observed results. Record the measurement point at which the business service is achieved.
    Evidence
    Measurement record with baseline population, source, expected and observed values, unit and timestamp.
Results

Model solution with justification

Situation The fictitious port bank checks a backup for its payment service. They compare duration, data level and technical usability and derive from it an after-test.

Distinguishing between the two criteria
The time value of 105 minutes exceeds the internal target by 15 minutes. The documented data gap of 11 minutes is within the assumed target.
Measurement to lead to technical release
The technical provision is an intermediate step. Technical usability decides on the achievement of the goal of re-starting.
Define post-test
The follow-up process uses the same objectives and a pre-measured professional comparison. It also records the data sample and the release.

Restart and data result in two findings

The technical provision is within the time window. The professional usability marks the end of the time measurement.

The time value is 105 instead of 90 minutes. The data level of 11 minutes before failure is checked separately against the target of 15 minutes.
The time value is 105 instead of 90 minutes. The data level of 11 minutes before failure is checked separately against the target of 15 minutes.

Secure the result in the post-test

Situation The fictitious port bank checks a backup for its payment service. They compare duration, data level and technical usability and derive from it an after-test.

Repeat the exercise with a data deviation despite the time limit. Both goals must be assessed separately and the release must reflect the remaining findings.

Keep the technical endpoint, the technical acceptance and the verified data gap separately. Link changed values to the concrete remedy and justify the new acceptance decision.

Templates and worksheets

The filler tool is directly under the task. Download the template for editing or open the Quick View.

  • Measurement protocol for a back-up

    Compare time to the technical usability, effective data level and sampled scope.

    Outcome RTO and RPO are calculated separately and associated with the technical release.

    Read the instructions

    Fictional example The restart target is 90 minutes, tolerated data loss 15 minutes. The run takes 105 minutes, data level 8 minutes before failure. RTO is exceeded by 15 minutes, the RPO is maintained.

    1. Restart and check data Capture restart target, data level, completeness and technical release separately.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Document the separate results. Make a cause clarification and a follow-up test with an unchanged scale.

Legal basis for this task

What is the next decision?

Transfer the decision to your own process and set the checked criterion. Then, in the case directory, select an exercise with other source data or a different role.

Restart test

Restart plan, agreed time and data targets, test stock and contact for the technical acceptance.

Edit a restart log with time measurement, data reconciliation and release request.

Work result Protocol with measuring points, data matching, decision and, where appropriate, date of the post-test.

Edit DORA case studies

Edit a DORA case with fictitious initial data, for example to the information register or to a payment malfunction. Solution and counter-probe help in the transfer.

Your result Reasoned decisions with supporting evidence and a repeatable follow-up test.