DORA · IMPLEMENTATION GUIDE

Back up and restore data

Check the scope of backup and data status in the test.

ASSESS
APPLY
DOCUMENT

What data and functions can be restored?

Determine what information is needed to resume a business function. Document backup rhythm, required recovery status and access to recovery. Conform the consequences of outdated or incomplete data with the department.

A recovery sample needs a defined data set and a technical endpoint. Before testing, determine which transactions and references belong together. After the backup, check on a sample which data can be used again by what time.

Check a security up to technical availability

Determine the amount of backup, time and data required for the function.

Deriving the scope of security from the services

Link databases, configuration levels and dependent data sources to the business function. Check which order ensures their common status.

Acceptance criterion
Justify applicability using evidenced activity or intended use, role and date. Assign an owner and due date to any unresolved assumption.
Evidence

A backup plan with data stands, responsible persons and verifiable scope.

Check recovery isolated

Perform the sample in the intended environment with approved accesses. Capture start time, data level used, completion time and integrity check.

Acceptance criterion
Use the same metric, population and unit for expected and observed results. Record the measurement point at which the business service is achieved.
Evidence

A protocol of technical restoration with measured values.

Decrease technical usability

Compare amounts and selected business incidents against the expected status. Document who confirms the figures and which unrestored transactions are reworked.

Acceptance criterion
A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
Evidence

A documented technical acceptance for the concrete data level.

Secure the statement with a sample

In the example, vote on the 997 recovered from 1.000 expected jobs. The release explains how the three missing jobs are tracked from a documented source.

Acceptance criterion
Reconcile the expected and restored populations at transaction level. Each discrepancy needs documented recovery or an explicit open acceptance decision.
Evidence
Versioned mapping of item, source and approved version with any discrepancy recorded.
TEST PLAY

A database is readable, but the comparison is missing

The test contains 997 of 1.000 expected orders. The department identifies three orders from the time after the backup point. The release documents whether they can be processed completely from a released source.

Common evidence for data and function The security, test and technical acceptance indicate the same date and version used.

What you are examining
Arrange the three missing records to the confirmed backup status. Compare the 997 found jobs and the three keys to follow with the released source list.
What the post-test decides
Close the comparison only after re-counting and a sample for usability. The result shows the source of the completed orders and the approved version.
Audit record
Measurement record with baseline population, source, expected and observed values, unit and timestamp.

Templates and worksheets

The filler tool is directly under the task. Download the template for editing or open the Quick View.

  • Acceptance protocol for a recovered data set

    Compare recovered data volume, completeness and known test records with the reference level.

    Outcome A data collection protocol shows number and type of missing entries, time target and responsible release.

    Read the instructions

    Fictional example After recovery, 9,998 of the 10,000 expected booking records are present and the recovered data meets the recovery point objective. The two missing records have neither been excluded nor reconstructed.

    1. Restart and check data Capture restart target, data level, completeness and technical release separately.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Stop the acceptance, determine the gap by reference and secure the retest after data correction.

Legal basis for this task

Compare the decision from the test example with the relevant rule.

Test restart with time and data records

Edit a restart protocol with time measurement, data reconciliation and release request. The assessments on EUGRC.AI are available for internal evaluation.