Plan risk-based resilience tests
Test gaps and priorities based on risks.
APPLY
DOCUMENT
Check the test coverage on concrete business impacts
Arrange functions, supporting systems and essential service providers to their default scenarios. Decide for every risk whether a technical, organizational or professional test provides the required proof. Consider the relevant minimum coverage.
A test program can contain many technical tests and leave the most important interruption open for operation. Connect any essential failure acceptance with a suitable test type and a technically measurable success criterion. Mark gaps that need to be processed in an appointment or decision.
Supporting the coverage of a test program
Work with the critical functions, inventory and approved test jobs.
Deriving a test list from functions and risks
Compare the inventory critical or important functions and supporting systems with existing test cases. Check which causes of failure or dependencies are not observed so far.
- Acceptance criterion
- Reconcile expected and observed records using the same identifier. Resolve missing, duplicate or unmatched records individually.
- Evidence
A well-founded coverage with open gaps.
Set test type and success criteria
Choose the appropriate methods, roles, demolition criteria and test environments. Separate a technical system test from the professional sample of an entire payment chain.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
A coordinated test program with measurable success criteria.
Keep deviations and follow-up tests in the plan
Arrange open findings and significant changes to a time for repetition. Check whether the test manager can prove the required independence and clearances.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
An updated test plan with findings, dates and proof of completion.
Secure the statement with a sample
Drag a function with an external interface. The test matrix shows whether the sample only checks the internal system or proves full performance.
- Acceptance criterion
- Select a function with an external interface. The plan assigns an observable end point, the external contribution and the acceptance role to the complete business service.
- Evidence
- Test record with transaction, expected business result, observed effect and finding decision.
The restart plan covers the interface to the payment service
The bank has only tested internal processing so far. For the next test, the external interface is added with a controlled acceptance procedure to enable the end-to-end service to be actually evaluated.
Test matrix with risk-appropriate coverage For each relevant system and function, test subject, frequency, type of test and findings remain verifiable.
- What you are examining
- Compare existing tests to the actual service chain. Check which proof the external interface needs and which result the department can take.
- What the post-test decides
- Choose a payment case that actually runs through the interface. The test portfolio must find results, verified environment, responsibility and post-test order for it.
- Audit record
- Roles record naming responsibilities, deputies and documented approval or escalation.
Templates and worksheets
The filler tool is directly under the task. Download the template for editing or open the Quick View.
Worksheet for a risk-based test programme
Determine samples from the risk and determine the scheduled date, additional test and supporting documents required for acceptance.
Outcome A risk-based test plan shall contain fully verifiable test items, dates, findings and follow-up tests.
Read the instructions
Fictional example The regular program tests the payment input and output. After an infrastructure change, an additional restart test is required. The memory change does not have a scheduled restart test.
- Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Set an event-related test and secure release, results and deviations after completion.
Legal basis for this task
Compare the decision from the test example with the relevant rule.
Art. 24 and 25 DORA · Test programme and types
Articles shall govern the risk-oriented test programme, testing requirements and available types of tests.
For your exam For each relevant system and function, test subject, frequency, type of test and findings remain verifiable.
Track a test result until acceptance
Follow a failed test criterion until the correction, retest and documented final decision. For internal evaluation, assessments are available on EUGRC.AI.