Link assets in the inventory
The business performance is related to their dependencies.
EVIDENCE
SAMPLE
What changes in the inventory when a performance migrates?
A verifiable inventory shows which information, systems and related services carry a named function. It remains understandable even after migrations, if identity, performance and actual version are maintained together.
Compare old and new existing status along the same business performance. At migration time, contract, technical configuration and function overview can show different change levels. Make the transition time visible and return previous test documents to the service used at that time.
Work steps and verifiable documents
To confirm the function of the department
Name the purpose of performance and the unit responsible. Capture relevant data stocks, applications, platforms and external services through their stable identifiers.
- Acceptance criterion
- Trace execution, review and approval to named roles. Check handover and deputy arrangements in the exercise.
- Evidence
Shared directory of function and dependencies.
Balance inventory and change
Compare the inventory with operational documentation, reference agreements and an approved change order. Determine which entries are new, replaced or out of operation.
- Acceptance criterion
- Reconcile expected and observed records using the same identifier. Resolve missing, duplicate or unmatched records individually.
- Evidence
Deviation list with time reference and responsible body.
Connect risk and detection
Check whether the technical assignment is used to prove the tests and protection measures in the same version. Set a proof of completion for outdated entries.
- Acceptance criterion
- Trace an asset found in operation to its function, owner and current inventory using the same identifier. Resolve orphaned and duplicate entries individually.
- Evidence
Proof of continuation with version, reference and sample.
Decision in the test example
The memory of the payment processing is migrated. The inventory still runs the old memory, while the contract already calls a new service.
- Compilation of documents
- Run two inventory rows with the beginning and end of each use. The sample shows whether an older test protocol still refers to the memory at that time and whether the current reference can be checked.
- Keeping a decision
- Three documents clarify the deviation. Modification approval, inventory and contract position are compared. The old assignment remains visible as a history with end date.
- Complete the test file
- Updated inventory line with ordered service, system status and department release.
- Sample and acceptance
- Select an application used before and after migration. Both must refer to the appropriate memory at the respective deadline.
- Audit record
- Timeline with confirmed trigger, time source, time zone and resulting decision.
The inventory position makes the connection to the new memory
Track the function's identifier by the sources. The released version state must appear on the actual application.
Templates and worksheets
The filler tool is directly under the task. Download the template for editing or open the Quick View.
Comparison of function and ICT stock
Control the actual functional and system reference against inventory and department.
Outcome Missing or duplicate relationships are listed as concrete findings with system evidence.
Read the instructions
Fictional example The payment service is based on the application PAY-A and the key service KEY-07. KEY-07 is missing after a technical migration from the target inventory.
- Is to compare and Insert independent target and actual lists as text. Declare missing, duplicated and additional identifiers.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Clarification and responsibility from the system change take over and after correction compare both inventory levels.
Legal basis for this task
DORA · Art. 8 · Identification
The rule combines business functions, roles and dependencies with information and ICT assets.
For your exam Use the function reference as the starting point of the sample.
ICT risk management · (EU) 2024/1774 · Art. 4 · Management of ICT assets
The Directive must cover the life cycle and central information on the stock.
For your exam Check whether the replaced inventory ends in a comprehensible manner.
What is the next decision?
In ICT operations, track a second dependence on the same business performance. Check in the dossier whether the old and new operating status can be distinguished by the identifications used.
ICT operation and protection
Arrange applications, data and external services of a business function. Then select a specific sample, such as a controlled memory change or the withdrawal of an authorisation.
Your result Inventory status with technical reference and documented control test.
Detection dossier
Test job, original sample, version reference, correction and documented retest.
Link target criterion, drawn sample, findings and retest. The memory example shows which protocols prove the effectiveness of alarming to the checked status.
Work result A dossier in which a third party monitors expectations, observations, findings and conclusions per test criterion.
Your result A dossier from which another person can repeat the same sample.

