Review networks and sites
Tracking a data flow over his dependencies.
EVIDENCE
SAMPLE
Tracking a data flow to the actual location
Track a relevant data flow from the application to its interfaces and to the site of operation. Document technical approval, technical protection rules and dependencies on site.
Start at a relevant interface and track the intended and observed performance path. If the location or connection has changed when changing, the documented protection measure must fit into the actual route used. Hold down source and time of deviation.
Work steps and verifiable documents
The released data flow also includes the operating location
Check the electronic transition and responsibility at the site along the same service.
Determine data flow and transitions
Identify source and target roles, zones involved, release and protection class. Briefly determine which organization is responsible for what transition.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
Data flow with documented transitions and responsibilities.
Transfer and segmentation evidence
Compare the data flow entered with a shared connection overview and approved protection. Track a change until you confirm the permitted connection again.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
Proof of operation and approval note for the selected transition.
Evaluate site impact
Check which access and environment certificates are available for the service and its restart. Determine which documents come from the provider or site operator.
- Acceptance criterion
- Select a real connection between two sites. Compare documented communications with the approved observed path and resolve discrepancies for each connection.
- Evidence
Assignment of supporting documents from the site to the business performance concerned.
Decision in the test example
A change of location changes the operational dependence of the payment service. The network diagram is up-to-date, the access proof refers to the former data centre.
- Compilation of documents
- Place the original and new transmission routes on the same checked functional reference. The acceptance indicates the route actually used and the proven protection at the relevant transfer.
- Keeping a decision
- The operator updates the location assignment and requests proof of the new operation point. The connection and its technical approval are checked at the same level of change.
- Complete the test file
- Released data flow model with documented transitions, current location and responsibility for proof.
- Sample and acceptance
- Select a transition to the external system. The location of the operation and the responsible role for access and transmission must be shown in the file.
- Audit record
- Versioned mapping of item, source and approved version with any discrepancy recorded.
Legal basis for this task
ICT risk management · (EU) 2024/1774 · Art. 13 · Network security
The rule includes segmentation, documentation of data flows and network access controls.
For your exam Check the actual data flow and its clearances.
DORA · Art. 6 para. 2 · Physical dependencies
The risk framework also takes into account relevant physical components and infrastructures.
For your exam Arrange the affected location documents for the same function.
What is the next decision?
Continue the test at another interface of the same performance. In the dossier, determine from which source you derive the path used and what change triggers a new check.
ICT operation and protection
Arrange applications, data and external services of a business function. Then select a specific sample, such as a controlled memory change or the withdrawal of an authorisation.
Your result Inventory status with technical reference and documented control test.
Detection dossier
Test job, original sample, version reference, correction and documented retest.
Link target criterion, drawn sample, findings and retest. The memory example shows which protocols prove the effectiveness of alarming to the checked status.
Work result A dossier in which a third party monitors expectations, observations, findings and conclusions per test criterion.
Your result A dossier from which another person can repeat the same sample.