EU AI ACT · CASE STUDY

A rising AI error rate

Deletion from operational records Correction, responsibility and recovery.

ROLE
DEPLOYMENT
OVERSIGHT

Starting position and test order

In the fictitious learning evaluation, the provider observes 80 professionally evaluated processes from the same target group per week. His previously confirmed observation plan requires a response of five percent or more confirmed critical deviations and at least 50 assessed processes per window.

In calendar week 38, two critical deviations occur. In week 39, there are six. The affected version is still 2.7. For the post-test of correction 2.8, 80 evaluated processes with a critical deviation are available again in week 40.

ObservationOperationsCritical deviationsCalculation value
Week 38 · 2.78022,5 %
Week 39 · 2.78067,5 %
Week 40 · 2.88011,25 %

Prepare the decision

  1. Technically review the increase

    Check if case group, observation and error definition have remained comparable. Capture the detectable signal with location of discovery. Secure the initial findings before correction.

    Testable evidence Supported observation signal with denominator, threshold and confirmed period

    Acceptance criterion
    A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.
  2. Separate reaction and resumption

    Decide on the appropriate remedy according to risk and non-conformity. Evaluate a potentially serious incident separately. Check the correction under comparable conditions.

    Testable evidence The competent authority, action, feedback to operators and independent resumption decision.

    Acceptance criterion
    A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.

What the test results

Situation In the fictitious learning evaluation, the provider observes 80 professionally evaluated processes from the same target group per week. His previously confirmed observation plan requires a response of five percent or more confirmed critical deviations and at least 50 assessed processes per window.

Model decision and justification

The rate increases from 2.5 to 7.5 percent. The second window triggers the agreed response in the example. The follow-up test falls below the trigger with 1.25 percent. The resumption also requires a confirmed post-test order and an independent assessment of remaining risks.

Counter-sample and impact

Replace the third window with twelve evaluated operations without critical errors. The observation is below the minimum number and does not carry the recovery.

Audit record
Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
At 80 operations each, the quotas are 2.5, 7.5 and 1.25 percent. The response starts at 5 percent.
At 80 operations each, the quotas are 2.5, 7.5 and 1.25 percent. The response starts at 5 percent.

The third week uses the corrected version. Compare the case group and the order for the retest.

Six critical deviations are followed by the correction 2.8. The post-test has a critical deviation. The department decides on the resumption.
Six critical deviations are followed by the correction 2.8. The post-test has a critical deviation. The department decides on the resumption.

The resultant comparison of figures bears the new technical decision.

Repeat with your own data

A rewriteable observation stock with quota, response needs and separate technical decision after the post-test.

  • Market monitoring and effectiveness of the remedy

    Run defined observation windows with confirmed critical cases and fixed minimum number. Determine responsibility, remedy and recovery separately.

    Outcome A rewriteable observation stock with quota, response needs and separate technical decision after the post-test.

    Read the instructions

    Fictional example KI14 · 2 of 80 correspond to 2.5 percent, 6 of 80 equal 7.5 percent. Week 39 triggers a reaction at the exercise threshold from 5 percent.

    1. The starting position Version, period and population
    2. Editing the Process Record quota, comparability and separate event decision
    3. Secure Decision Review remedy and resumption of the new situation

Official sources

What is the next decision?

First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.

  • Market monitoring and corrections

    Transfer method and result to your own use.

    Starting point System and version identifier, reference window, number of evaluated operations, confirmed findings and feedback from operators.

    Work result A documented response with responsibility, decision on continued operation or suspension and a secured retest.

    View the guide
  • Case studies

    You want to practice with fictitious data first or understand a similar decision from another role.

    Compare how another decision needs to be taken.

    Work result The cases provide initial data, a test order and a reasoned sample decision. Change a concrete condition and check the impact.

    Select Case studies