EU AI ACT · CASE STUDY

Awareness before training ends

Determine the trigger for the message and track remedy at the right model version.

ROLE
DEPLOYMENT
OVERSIGHT

Starting position and test order

On 5 October 2028, the fictional model provider Klartext confirms from approved plans and documented compute figures that K4 will exceed the 10²⁵ FLOP threshold. The final report dated 20 October records 1.2 × 10²⁵ FLOPs. The Commission received the notification on 6 October.

In the corresponding test protocol, one of six pre-defined safety assessments is open. Determine the time reference, the model version used and the necessary retest. Proceed from a confirmed path according to Art. 52 para. 1.

EvidenceDate or valueMeaning for the decision
Confirmed knowledge5 October 2028Time reference under Art. 52 (1)
Communication6 October 2028Evaluate immediateness separately
Training completion20 October 2028Later evidence of training compute, 1.2 × 10²⁵ FLOPs

Prepare the decision

  1. Early confirmed knowledge

    Secure forecast, release date and justification when the overrun was known. Calculate the calculation mark of two weeks from that date.

    Testable evidence Comparison between 5 and 19 October and the reasoned decision on dispatch.

    Acceptance criterion
    Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
    Evidence
    Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.
  2. Continue evaluation and remedy

    Arrange six required evaluation evidences of the model version K4. For the missing sample, keep the responsible body and the release status until repeat.

    Testable evidence The test chain of five existing documents and an open repetition.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.

What the test results

Situation On October 5, 2028, the fictitious model provider Klartext confirms, based on approved planning and documented calculation values, that K4 will exceed the threshold of 10²⁵ FLOP. The subsequent final report of October 20 shows 1.2 × 10²⁵ FLOP

Model decision and justification

The calculation mark is on 19 October. Training ends only after that. The communication of 6 October can be found before the calculation mark. The suitability of the reaction and the immediacy are justified separately. Five instead of six evaluation evidence leave an open finding behind.

Counter-sample and impact

Enter 20 October as the dispatch date and retain 5 October as the date of awareness. Then use exactly 10²⁵ FLOPs. At that figure, the compute-based presumption does not apply. The capabilities and any decision by the Commission still need to be checked.

Audit record
Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
Information on 5 October, Communication on 6 October, Calculated deadline on 19 October and completion of training on 20 October
Information on 5 October, Communication on 6 October, Calculated deadline on 19 October and completion of training on 20 October

In this case, the time limit begins with the proven knowledge on 5 May. October. The training degree is later.

The communication is documented. Five out of six model evaluations are available. The missing test needs remedy.
The communication is documented. Five out of six model evaluations are available. The missing test needs remedy.

The open model evaluation remains valid even with documented shipping as own order.

Repeat with your own data

A documented communication file with a calculated maximum mark, separate decision on immediacy and open assessments.

  • Systemic GPAI risk and notification file

    Capture the training effort, confirmed case group and earliest knowledge. Continue the evaluation evidence separately.

    Outcome A documented communication file with a calculated maximum mark, separate decision on immediacy and open assessments.

    Read the instructions

    Fictional example KI19 · The overrun is known on October 5. The calculation mark is on October 19. One out of six evaluations remains open.

    1. The starting position Threshold, Capability and Case Group
    2. Editing the Process Reconstructing Early Knowledge and Submission
    3. Secure Decision Treat missing evaluation evidence with post-test

Official sources

First check for this task

Other official references1

What is the next decision?

First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.

  • Systemic risk and supervision

    Transfer method and result to your own use.

    Starting point Training forecast and final receipt, skills and dissemination, documented classification and secure reception.

    Work result A reasoned classification decision with verifiable notification, associated risk measures and repeatable assessment documents.

    View the guide
  • Case studies

    You want to practice with fictitious data first or understand a similar decision from another role.

    Compare how another decision needs to be taken.

    Work result The cases provide initial data, a test order and a reasoned sample decision. Change a concrete condition and check the impact.

    Select Case studies