Awareness before training ends
Determine the trigger for the message and track remedy at the right model version.
DEPLOYMENT
OVERSIGHT
Starting position and test order
On 5 October 2028, the fictional model provider Klartext confirms from approved plans and documented compute figures that K4 will exceed the 10²⁵ FLOP threshold. The final report dated 20 October records 1.2 × 10²⁵ FLOPs. The Commission received the notification on 6 October.
In the corresponding test protocol, one of six pre-defined safety assessments is open. Determine the time reference, the model version used and the necessary retest. Proceed from a confirmed path according to Art. 52 para. 1.
| Evidence | Date or value | Meaning for the decision |
|---|---|---|
| Confirmed knowledge | 5 October 2028 | Time reference under Art. 52 (1) |
| Communication | 6 October 2028 | Evaluate immediateness separately |
| Training completion | 20 October 2028 | Later evidence of training compute, 1.2 × 10²⁵ FLOPs |
Prepare the decision
Early confirmed knowledge
Secure forecast, release date and justification when the overrun was known. Calculate the calculation mark of two weeks from that date.
Testable evidence Comparison between 5 and 19 October and the reasoned decision on dispatch.
- Acceptance criterion
- Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
- Evidence
- Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.
Continue evaluation and remedy
Arrange six required evaluation evidences of the model version K4. For the missing sample, keep the responsible body and the release status until repeat.
Testable evidence The test chain of five existing documents and an open repetition.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
- Versioned mapping of item, source and approved version with any discrepancy recorded.
What the test results
Situation On October 5, 2028, the fictitious model provider Klartext confirms, based on approved planning and documented calculation values, that K4 will exceed the threshold of 10²⁵ FLOP. The subsequent final report of October 20 shows 1.2 × 10²⁵ FLOP
Model decision and justification
The calculation mark is on 19 October. Training ends only after that. The communication of 6 October can be found before the calculation mark. The suitability of the reaction and the immediacy are justified separately. Five instead of six evaluation evidence leave an open finding behind.
Counter-sample and impact
Enter 20 October as the dispatch date and retain 5 October as the date of awareness. Then use exactly 10²⁵ FLOPs. At that figure, the compute-based presumption does not apply. The capabilities and any decision by the Commission still need to be checked.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
In this case, the time limit begins with the proven knowledge on 5 May. October. The training degree is later.
The open model evaluation remains valid even with documented shipping as own order.
Repeat with your own data
A documented communication file with a calculated maximum mark, separate decision on immediacy and open assessments.
Systemic GPAI risk and notification file
Capture the training effort, confirmed case group and earliest knowledge. Continue the evaluation evidence separately.
Outcome A documented communication file with a calculated maximum mark, separate decision on immediacy and open assessments.
Read the instructions
Fictional example KI19 · The overrun is known on October 5. The calculation mark is on October 19. One out of six evaluations remains open.
- The starting position Threshold, Capability and Case Group
- Editing the Process Reconstructing Early Knowledge and Submission
- Secure Decision Treat missing evaluation evidence with post-test
Official sources
First check for this task
Regulation (EU) 2024/1689 as amended on 27 July 2026
Readable version with the changes made by Digital Omnibus on AI. The application rules are to be read for your own deadline.
Questions about the GPAI role and model change
The FAQ explains model concept, provision, provider role and threshold criterion for changes. Check the case assumptions separately.
GPAI Code of Conduct
Voluntary instrument. The legal obligations under Chapter V remain the test standard.
Other official references1
- Information and documentation for the GPAI supervision (opens in new tab)
AI Act Service Desk · Amtlicher Wegweiser
Compare the specific request with Art. 91 and confirm the model version and the authorised route of transmission.
What is the next decision?
First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.
Systemic risk and supervision
Transfer method and result to your own use.
Starting point Training forecast and final receipt, skills and dissemination, documented classification and secure reception.
Work result A reasoned classification decision with verifiable notification, associated risk measures and repeatable assessment documents.
View the guideCase studies
You want to practice with fictitious data first or understand a similar decision from another role.
Compare how another decision needs to be taken.
Work result The cases provide initial data, a test order and a reasoned sample decision. Change a concrete condition and check the impact.
Select Case studies

