From AI incident to reporting
Reconstruct the incident and prove who needs to check which message.
IMPACT
REPORTING
Starting position and test order
The fictitious port bank uses a high-risk AI system for credit verification. A faulty assignment of information leads to several unlawfully disadvantageous decisions. On February 7, 2028 at 09:00 UTC, the department confirms the impact. For the exercise, the reportable rule case is specified according to the AI regulation.
The bank stops the operation concerned and informs the provider at 09:30 UTC. It then informs the other relevant authorities. On February 8 at 11:00 UTC, the provider establishes the sufficiently probable connection with its system. Ten minutes later, it reports the incident to the relevant market surveillance authority.
Edit the case independently
The earliest knowledge proves
Follow the first notice until the seriously confirmed incident. Determine the time and the responsible role per event.
Testable evidence Tuning chronology and retraceability of the raw data used.
- Acceptance criterion
- Trace execution, review and approval to named roles. Check handover and deputy arrangements in the exercise.
- Evidence
- Roles record naming responsibilities, deputies and documented approval or escalation.
Separating operators and providers
Arrange the notifications, determine the probability, the provider notification and the confirmed acceptance individually.
Testable evidence Shipping and receipt documents per roll and version.
- Acceptance criterion
- Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
- Evidence
- Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.
Evidence of the effect of the remedy
Take the status of suspension, subsequent correction, newly examined assignments and decision on restart.
Testable evidence Limitation and verifiable remedy with its own re-release.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
- Evidence list recording original source, version, documented mapping and owner.
What the test results
Situation An AI system for credit checks misclassifies information. Several people have been illegally penalised during the exercise. The fictitious port bank suspends the operation. The provider checks the connection with the system and must prove its own reporting path.
Model decision and justification
The Bank will demonstrate its knowledge at 09:00 UTC on February 7, the suspension and the message to the Provider at 09:30. The Provider will demonstrate the reasonable probability of the connection on February 8, at 11:00 and the dispatch of its notification at 11:10.
The exercise anticipates the earliest confirmed knowledge for the regular 15-day maximum limit on February 7. The accounting check day is February 22, 2028. For the verification of the immediate notification, compare the documented detection of the provider with the actual transmission
Counter-sample and impact
Move the dispatch of the provider message to February 9. Leave the documented date of the determination on February 8 at 11:00 UTC equal
The new shipment is in front of the maximum value. The long period until the notification requires a separate justification. The bank will keep the restart open until the correction is checked and released on the basis of comparable credit transactions.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
Time base UTC. The representation arranges the evidence in order and uses schematic spacing.
Templates and worksheets
Use the workbook for your own data and calculations. The fillable quick view contains a sample sample and a protocol for your own process.
AI incident file and reporting chronology
Separate earliest knowledge, confirmation of the context, transmission document and the arithmetic mark for the confirmed reporting type.
Outcome A comprehensible handover of operators and suppliers with dispatch status, open deadline question and post-test order.
Read the instructions
Fictional example KI07 · Awareness was established on 7 February 2028. The 15th calendar day is 22 February. The causal link was established earlier, on 8 February at 11:00 UTC.
- The starting position Identifying reporting facts, system version and role
- Editing the Process Acknowledge knowledge, context and dispatch in UTC
- Secure Decision Only evaluate the confirmed path and track remedy
Official sources
Regulation (EU) 2024/1689 as amended on 27 July 2026
Readable version with the changes made by Digital Omnibus on AI. The application rules are to be read for your own deadline.
Regulation (EU) 2026/1744 · Digital Omnibus on AI
Officially published changes, including AI competence, high risk periods and transitional rules.
Transfer the result to your own use
First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.
Operation and serious incidents
An AI system has affected people, rights or a professional process. They must reconstruct effects and reporting steps.
Secure impact, knowledge time, version and the reporting track of the relevant role.
Work result They ensure the system status concerned and continue to suspend, inform operators and notify providers of each role.
View the guideOther cases
You want to practice with fictitious data first or understand a similar decision from another role.
Select a case by task and available sample.
Work result The cases provide initial data, a test order and a reasoned sample decision. Change a concrete condition and check the impact.
Select Case studies

