Regulator checks the delivered version
The request lacks up-to-date test documents.
DEPLOYMENT
OVERSIGHT
Starting position and test order
The fictitious market surveillance requires a provider to provide the technical documentation and test results for a delivered high-risk AI. The released set of documents contains three out of four required evidence. The existing fourth test is part of the pre-version.
An additional message asks for access to the entire developer archive without any comprehensible version and purpose. The organization must process the confirmed request while at the same time clarifying the scope of the additional access.
Compare baseline values
Documents required
- Scale
- 4 out of 4 assigned
- Observed
- 3 of 4 allocated
Additional access
- Scale
- Reasoned and confirmed scope
- Observed
- Subject matter unclear
Transmission
- Scale
- Protected path and receipt
- Observed
- Prepared
Check and prove
Determine the subject matter and time limit of the confirmed request
Support the job, the specific system version and the requested documents. Capture the fourth missing proof.
Testable evidence Response file with deadline, revealed gap and responsible person.
- Acceptance criterion
- The calculation and decision use the same substantiated trigger. Record actual events and planned timing separately, with a common time basis.
- Evidence
- Timeline with confirmed trigger, time source, time zone and resulting decision.
Check additional source code access
Compare the specific request with the requirements for the necessary access and use of other test equipment. Clear the range at the competent authority.
Testable evidence Reasoned decision on scope and protected transfer route.
- Acceptance criterion
- Justify applicability using evidenced activity or intended use, role and date. Assign an owner and due date to any unresolved assumption.
- Evidence
- Reasoned applicability assessment recording facts, reference, role, date and open assumptions.
Pass and acknowledge correct version
Compare each file and test reference with the delivered status. Document the handover and the open time limit for missing proof.
Testable evidence Checked handover list with receipt and original documents.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
- Versioned mapping of item, source and approved version with any discrepancy recorded.
What the test results
Situation The fictitious market surveillance requires a provider to provide the technical documentation and test results for a delivered high-risk AI. The released set of documents contains three out of four required evidence. The existing fourth test is part of the pre-version.
Model decision and justification
The provider processes the confirmed request within the time limit and designates the document gap to the delivered version. A test of the pre-version does not cover the requirement in case.
The additional request is specified by the competent recipient. The decision on source code, scope of verification and protected provision is documented separately.
Counter-sample and impact
Complete the version correct test, but leave the receipt confirmation missing in the handover file. The technical completeness increases to four out of four. The handover is unfulfilled.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
Documenting the test bench with your own data
A comprehensible handover directory with jurisdiction, deadline, transmission document and well-founded access question.
Provide evidence for supervision per subject matter and version
Edit requests, formal gaps and confirmed technical risks with separate scope and documented handover.
Outcome A time-limited handover or action note with independent closing points for each finding.
Read the instructions
Fictional example Three out of four requested documents are available for the situation concerned. Four out of six reactions succeed in an independent risk test.
- The starting position Identifying the competent body, concrete findings and version
- Editing the Process Check documents and actual technical impact separately
- Secure Decision Evidence of handover, receipt or repeated effect
Official sources
Regulation (EU) 2024/1689 as amended on 27 July 2026
Readable version with the changes made by Digital Omnibus on AI. The application rules are to be read for your own deadline.
Article 74 · Access and market surveillance powers
Check the scope and address of the request. When accessing source code, support the specific requirements as well as a protected transfer route.
What is the next decision?
First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.
Technical evidence and amendments
Organize documents according to verified version and delivery status.
Starting point Manifestation of delivery, list of changes, technical documentation and results of the samples required for the modification.
Work result A clearly versioned file with evidence required and a reasoned decision on the further procedure.
View the guideRequesting and accessing authorities
Transfer the decision to your own use.
Starting point Confirmed letter, four expected proofs, version reference and authorised answers.
Work result A comprehensible handover directory with jurisdiction, deadline, transmission document and well-founded access question.
View the guide

