EU AI ACT · CASE STUDY

Regulator checks the delivered version

The request lacks up-to-date test documents.

ROLE
DEPLOYMENT
OVERSIGHT

Starting position and test order

The fictitious market surveillance requires a provider to provide the technical documentation and test results for a delivered high-risk AI. The released set of documents contains three out of four required evidence. The existing fourth test is part of the pre-version.

An additional message asks for access to the entire developer archive without any comprehensible version and purpose. The organization must process the confirmed request while at the same time clarifying the scope of the additional access.

Compare baseline values

  • Documents required

    Scale
    4 out of 4 assigned
    Observed
    3 of 4 allocated
  • Additional access

    Scale
    Reasoned and confirmed scope
    Observed
    Subject matter unclear
  • Transmission

    Scale
    Protected path and receipt
    Observed
    Prepared

Check and prove

  1. Determine the subject matter and time limit of the confirmed request

    Support the job, the specific system version and the requested documents. Capture the fourth missing proof.

    Testable evidence Response file with deadline, revealed gap and responsible person.

    Acceptance criterion
    The calculation and decision use the same substantiated trigger. Record actual events and planned timing separately, with a common time basis.
    Evidence
    Timeline with confirmed trigger, time source, time zone and resulting decision.
  2. Check additional source code access

    Compare the specific request with the requirements for the necessary access and use of other test equipment. Clear the range at the competent authority.

    Testable evidence Reasoned decision on scope and protected transfer route.

    Acceptance criterion
    Justify applicability using evidenced activity or intended use, role and date. Assign an owner and due date to any unresolved assumption.
    Evidence
    Reasoned applicability assessment recording facts, reference, role, date and open assumptions.
  3. Pass and acknowledge correct version

    Compare each file and test reference with the delivered status. Document the handover and the open time limit for missing proof.

    Testable evidence Checked handover list with receipt and original documents.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.

What the test results

Situation The fictitious market surveillance requires a provider to provide the technical documentation and test results for a delivered high-risk AI. The released set of documents contains three out of four required evidence. The existing fourth test is part of the pre-version.

Model decision and justification

The provider processes the confirmed request within the time limit and designates the document gap to the delivered version. A test of the pre-version does not cover the requirement in case.

The additional request is specified by the competent recipient. The decision on source code, scope of verification and protected provision is documented separately.

Counter-sample and impact

Complete the version correct test, but leave the receipt confirmation missing in the handover file. The technical completeness increases to four out of four. The handover is unfulfilled.

Audit record
Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.

Documenting the test bench with your own data

A comprehensible handover directory with jurisdiction, deadline, transmission document and well-founded access question.

  • Provide evidence for supervision per subject matter and version

    Edit requests, formal gaps and confirmed technical risks with separate scope and documented handover.

    Outcome A time-limited handover or action note with independent closing points for each finding.

    Read the instructions

    Fictional example Three out of four requested documents are available for the situation concerned. Four out of six reactions succeed in an independent risk test.

    1. The starting position Identifying the competent body, concrete findings and version
    2. Editing the Process Check documents and actual technical impact separately
    3. Secure Decision Evidence of handover, receipt or repeated effect

Official sources

What is the next decision?

First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.

  • Technical evidence and amendments

    Organize documents according to verified version and delivery status.

    Starting point Manifestation of delivery, list of changes, technical documentation and results of the samples required for the modification.

    Work result A clearly versioned file with evidence required and a reasoned decision on the further procedure.

    View the guide
  • Requesting and accessing authorities

    Transfer the decision to your own use.

    Starting point Confirmed letter, four expected proofs, version reference and authorised answers.

    Work result A comprehensible handover directory with jurisdiction, deadline, transmission document and well-founded access question.

    View the guide