EU AI ACT · IMPLEMENTATION GUIDE

Hand over human oversight

Effectively stop an AI proposal after shift changes and prove the effect up to the connected specialized system.

ROLE
DEPLOYMENT
OVERSIGHT

Set the test subject

Deletion from the instructions for use and risk assessment, which a person in the system must be able to see, assess and stop. Distinguishing training, current eligibility, responsibility and actual measured effect of the intervention.

Perform a sample over the regular handover. Use the intended replacement route, confirm the time of the stop and observe which process steps continue after suspension.

Check and prove

  1. Set the stop criterion from process

    Define the permissible time, follow-up and replace it with a decisive role for each transfer situation.

    Testable evidence Released due at time, jurisdiction and suspension.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.
  2. Watching access and actual impact together

    Measure the period from visibility and transition to the follow-up system. Determine operating action and technical impact separately.

    Testable evidence Time log with the failed handover case.

    Acceptance criterion
    Show which discrepancy changes impact on the affected service or product. Match it to an action and a responsible decision on residual risk.
    Evidence
    Risk entry with impact, action, residual risk and approval.
  3. Remove correction with replacement roll

    Repeat the sample after the right change with absent main role. Support that the issue is effectively withheld.

    Testable evidence After-test with time, responsible person and confirmed condition.

    Acceptance criterion
    Trace execution, review and approval to named roles. Check handover and deputy arrangements in the exercise.
    Evidence
    Roles record naming responsibilities, deputies and documented approval or escalation.

The right to stop is missing when transferring the shift

A fictitious utility already uses an AI system that is classified as highly critical to prioritising supply operations. In one exercise, professional roles must stop controversial proposals within five minutes.

What you decide

A decision whether the transfer path is effective, with a reasoned and measurable follow-up test.

Edit case · When transferring the layer, the permission to stop is missing

Documenting the test bench with your own data

A decision whether the transfer path is effective, with a reasoned and measurable follow-up test.

  • Operating acceptance by roll, data channel and operating path

    Compare the operationally controlled fall groups and measure stop, cover and accessibility at the actual process.

    Outcome Separate acceptance per input channel, roll or operating path with verifiable criterion and remedial action.

    Read the instructions

    Fictional example In mobile receipts, mandatory information is missing in four out of 20 cases. The overall rate is five percent. For the release, the mobile quota counts 20 percent.

    1. The starting position Create a row per roll, data channel or operating path
    2. Editing the Process Check sample and observed effect with the same scale
    3. Secure Decision Connect deviation with responsible persons, correction and post-test

Official sources

What is the next decision?

Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.

  • AI literacy

    Put the observed error into a role-related practical exercise.

    Starting point Role list, permitted interventions, guidance, relevant use cases and criteria for observation.

    Work result A role overview with exercise, measured action, open gap of competence and the date of the re-examination.

    View the guide
  • The right to stop is missing when transferring the shift

    A fictitious utility already uses an AI system that is classified as highly critical to prioritising supply operations. In one exercise, professional roles must stop controversial proposals within five minutes.

    Apply the scale to concrete values and check the counter-test.

    Your decision A decision whether the transfer path is effective, with a reasoned and measurable follow-up test.

    Work through the case