Prepare progress and final reports

Connect status, affected dispatch and processing end with evidence per reporting stage.

SCOPE
IMPLEMENTATION
EVIDENCE

Check the date on the basis of the actual incident report

Determine the relevant time reference from the actual transmission. In the national procedures considered, notification No. 2 is the starting point of the monthly period. Check the processing status and, if necessary, the further deadline after completion of the processing. DORA applies its own reference there.

Take the message no. 2. Check the status of the calculated monthly reference and keep the open processing separately.

Progress or completion with the established status

Perform the test

Lead to each level of content, time of dispatch, recipient and receipt. Check on the relevant date whether the incident persists and which information is already confirmed. Document remedy, still existing effects and the confirmed cause according to the actual state of knowledge.

Acceptance criterion
Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
Evidence
Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.

Result and further processing

Complete and reconstructable reporting status from the first dispatch to the documented final report. An ongoing case receives the progress report at the relevant date. The conclusion is submitted after completion of processing.

Acceptance criterion
Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
Evidence
Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.
The first notice is accompanied by documented effects on the decision and comprehensible transmission.
The first notice is accompanied by documented effects on the decision and comprehensible transmission.

The first notice is accompanied by documented effects on the decision and comprehensible transmission.

An example with negative test

Initial situation and observed findings

The report No. 2 expired on November 18. Processing continues on the monthly reference. The team documents a progress report and checks the subsequent completion from the documented end of the processing on January 10. An earlier confirmation of receipt is carried out as own process

Negative test

Change only the dispatch of the early first message. The national monthly reference continues to follow the no. 2 message. Then check the influence of a postponed processing end.

Audit record
Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.

The own test bench

Support knowledge, reporting levels and recipients. Calculate the 24-hour and 72-hour limits as well as the monthly receipt.

  • Decision of incident and reporting deadlines

    Support knowledge, reporting levels and recipients. Calculate the 24-hour and 72-hour limits as well as the monthly receipt.

    Outcome Chronology with separate right triggers, maximum limits, shipping and reception.

    Read the instructions

    Fictional example A significant incident is reported around 09:30 UTC. The incident report is sent 50 hours later. The conclusion follows calendarly from the actual message. In case of an ongoing incident, the progress must be made first.

    1. Evidence Identify the relevant time, service concerned, competent body and facts.
    2. Select stages and exceptions Document regular hours profile, trust service review and individual process separately.
    3. Check calendar limit and shipping Technically confirm the monthly limit and special cases. Organise immediate transmission and secure all receipts.
  • Registration deadlines for DORA, NIS2 and specialist law

    Calculate the basic periods of time for the same event from the respective knowledge, classification and transmission times. Run DORA and national paths in separate sheets.

    Outcome Time and receipt chains per legal entity and reporting obligation. Each reporting stage has its own time reference.

    Read the instructions

    Fictional example N11 · The dispatch of the DORA initial report sets the 72-hour reference for the intermediate report. In the TK and MSP thread, knowledge of the significant incident determines the 72 hours. N12 adds EnWG and critical water system.

    1. Confirm Concern and Classification Link the same event identifier to service, jurisdiction, knowledge and each path of confirmed classification.
    2. Check shipping times and steps Capture actual shipping times. Use the last relevant intermediate message or the national No. 2 message matching the path.
    3. Confirm calendar and transmission Check work calendar, exception and progress reference if necessary. Link the decision to the relevant reporting channel.

Legal basis for this task

First check for this task

Other official references1
  • § 5d EnWG · Documentation, registration and incident reporting (opens in new tab)

    Sektorales Recht · Energie, Telekommunikation, Gesundheit und Wasser

    Distinguishingly the documentation of the catalogue for the Federal Network Agency, registration with the BSI and the reporting stages to the reporting point according to § 32 BSIG. For existing energy supply network operators outside the BSIG categories, paragraph 4 states 6 March 2026 as a statutory event date.

Deriving the next order from the result

Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.

  • Complete findings with robust follow-up

    In addition to the deviation, also ensure the observed condition, the original scale and the performance affected. Perform cause, correction and follow-up testing under the same detection code. The remedy certificate confirms the changed status.

    The report is processed and the effectiveness of the remedy must be demonstrated.

    Evidence of cause, released change, comparability, counter-sample and completion for the same finding

    Your decision Which run completely checks the original problem? Connect the result to the documented release.

    Work through the case
  • Report security incident

    An event is taking place and you need to clarify the relevance and deadlines.

    Track knowledge, early initial reporting, incident reporting and closure on the basis of the same event.

    View the guide