CRA · IMPLEMENTATION GUIDE

Module H and notified body scope

Check quality system, scope of the body and the product family covered.

PRODUCT
CONFORMITY
MAINTENANCE

What you decide and prove

Confirm the product category based on the core function, Annex III and the associated technical description. Determine the procedures permitted under Art. 32. For Class II, internal production control is not a permissible replacement for the proposed processes as the sole route according to Module A.

If the manufacturer chooses Module H, you will be required to provide the verified scope of the competent notified body, the approved quality system and monitoring evidence. Check how an intended change of the system is notified, evaluated and documented. Keep track of the delivery situation until the decision has been clarified.

Edit the test step by step

  1. Deriving the path of conformity from category and delivery level

    Determine core function, product class and permissible alternatives. Reason module H for the selected product scope.

    Testable evidence Dated procedural decision with official reference and responsibility for release.

  2. Notification and quality system

    Open the official entry of the body. Compare the notification scope with product and module. Find out if the new process is captured by the confirmed quality system.

    Testable evidence Match with the location of the discovery and understandable status of the decision on the change.

  3. Treating site changes in a comprehensible way

    Secure the notification of changes, the response of the body and related documents. Document the actual delivery status of the existing proof.

    Testable evidence Release scope and additional verification order prior to use of the new site.

A new test scope is missing in the quality system confirmation

A manufacturer develops a hypervisor delivered independently. The core function and technical description result in an important product of class II in the case of instruction. He selects module H. The valid scope of the notified body and confirmation for the previous development and release site are documented.

In future, a second location will be opened up. Internal samples will exist. The manufacturer has notified the body of the intended change in the approved quality system. A documented decision by the body whether the modified system must be met or re-evaluated is missing. Otherwise, the previous workflows will remain.

What you'll find out in the case

Procedure note with a clear scope of location and activity, as well as documented decision to amend.

Editing the Practice Case

Templates and worksheets

  • Scope of procedure and release with module H

    Connect product category, notified body, confirmed quality system and decision to change.

    Outcome Procedural file with documented scope of proceedings per location and concrete clearance decision.

    Read the instructions

    Fictional example The second site is internal samples. The decision of the location to change system is missing.

    1. Identify the starting situation Assign product core function, category and evaluation method.
    2. Run the test Comparing the level of notification, approved system and amendment
    3. Secure decision and evidence Document the extent of release and job decision.

Official sources

First check for this task

Other official references1

What depends on your result?

  • Clear type modification with notified body

    In alternative path B and C, check the range of the type certificate and corresponding serial documents instead.

    View the guide
  • Verify standard level and coverage

    Check the actual coverage of the standards used and the official reference published for that purpose.

    View the guide