CRA · IMPLEMENTATION GUIDE

CRA and radio equipment rules

Check the original market provision of radio equipment.

PRODUCT
CONFORMITY
MAINTENANCE

What you decide and prove

For each unit, check when it was first made available in the Union market. Confirm the classification as a radio and, for the previous period, the concrete application of RED requirements under Delegated Regulation (EU) 2022/30. Place the affected delivery status on the file.

Delegated Regulation (EU) 2026/339 repeals Delegated Regulation (EC) 2022/30 with effect from 11 December 2027. Further relevant obligations of the Radio Equipment Directive remain to be assessed per device. For existing products, check Art. 69 CRA including subsequent significant changes and independent CRA reporting requirements.

The first purchase per delivery

Twelve radio gateways were placed on the market on 8 December 2027. For eight more, 12 December is planned.
Twelve radio gateways were placed on the market on 8 December 2027. For eight more, 12 December is planned.

Link each serial number to the first market reference. Evaluate the previous cyber requirements, the new CRA reference and the reporting obligation separately.

Edit the test step by step

  1. Track units and reference date

    Secure the first documented market reference per unit. Link it to version and documents. Record resale and subsequent changes separately.

    Testable evidence Dated list with comprehensible first-time marketing.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.
  2. Determine relevant evidence per time reference

    Arrange the previous lot of the then RED-cyber test and the new lot to the required CRA-proof. Perform further relevant radio requirements and reporting obligation separately.

    Testable evidence The classification note shall be made in accordance with the provisions of the undelivered, legislative and technical acts.

    Acceptance criterion
    A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.
  3. Check common evidence for portability

    Open the original raw reports. After actual coverage, clarify which observations support the CRA stand and where a proof is missing.

    Testable evidence The decision to cover the new lot and the comprehensible inventory for the previous lot.

    Acceptance criterion
    A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.

Two delivery-free persons are on different sides of the deadline

A manufacturer will be placing twelve networked radio gateways on the EU market for the first time on 8 December 2027. In case of instruction, the devices will fall under the RED cyber requirements triggered by Delegated Regulation (EU) 2022/30. The delivery list, previous legal reference and related test report are documented and the lot will then be resold without significant change.

Another eight gateways were manufactured before, but not yet placed on the market. Their first EU market reference is planned for December 12, 2027. The manufacturer owns the same earlier RED cyber file. The documented reference of the new lot to the correct CRA process is missing.

What you'll find out in the case

Separate files for market access, continuing radio requirements and reporting obligation per delivery.

Editing the Practice Case

Templates and worksheets

  • Radio equipment and market access per delivery

    Capture the first placing on the market individually and justify the relevant file to radio system and CRA.

    Outcome Comparable classification for unstocked, unbroken and separate reporting requirements.

    Read the instructions

    Fictional example The two gatewayless were first made available or planned for on 8 and 12 December 2027.

    1. Identify the starting situation Connect initial deployment with version and piece list.
    2. Run the test Check the RED and CRA requirements at time.
    3. Secure decision and evidence Determine the continuing radio requirements and notification separately.

Official sources

First check for this task

Other official references2

What depends on your result?

  • Application data and inventory products

    Clear first placing, distribution and subsequent change on the basis of the same time and version reference.

    View the guide
  • Reporting route and deadlines

    Document the actual trigger and the reporting path for the responsible manufacturer role.

    Check the reporting route and deadlines