CRA · LEGAL SOURCES

CRA article register

Find articles and annexes with links to official wording and checks for your product.

PRODUCT
CONFORMITY
MAINTENANCE

From CRA article to verifiable proof

The register opens up all 71 articles and eight annexes. Start with the article number, a keyword or a legal area. You will find concrete test orders, counter-samples, case examples and linked work equipment on practical topics.

Use the test matrix for a systematic examination of Annex I. For market reference, publication or continuation, open the linked official find site in the version relevant to your date of reference.

Requirements and test points

CRA · Article Register

Art. 13 · Manufacturer obligations in release and support

Addressee Manufacturer, development and product safety

Conform risk assessment, component testing, conformity, update availability and user information at the product level.

Measures, evidence and sampling

Manufacturer's obligationsCRA-A13-001

Disconnect Delivery and Remedy

Check clearly identified documents and ability to release security updates and notifications.

Testable evidence
Decide with delivery ban or confirmed release.
Sample
Do not use the trademark and instead introduce a verifiably significant change in the equipment software. Check the manufacturer role again and refer the decision to the actually changed product.

Paragraphs 5 and 6CRA-A13-002

Secure the expected size

From build and delivery manifest, find out nine direct libraries. Include the necessary remote process in the comparison.

Testable evidence
Full expectation with a clear product level.
Sample
Complete the ninth position with the library version from the test system. The number is correct, but the version balance keeps the position open until confirmation.

Paragraph 8CRA-A13-003

Support expected use

Compare the maintenance cycle with spare parts plan, technical use and dependencies.

Testable evidence
Documented and plausible useful life of eight years.
Sample
Change the confirmed support end so that it extends beyond March 20, 2040. For this exercise, the later support end becomes the minimum date for the update call.

Paragraph 9CRA-A13-004

Check the availability of an update

Determine both final data and check the publication proof as well as the location of the discovery.

Testable evidence
Calculated availability mark and confirmed download path.
Sample
Change the confirmed support end so that it extends beyond March 20, 2040. For this exercise, the later support end becomes the minimum date for the update call.

Paragraphs 2 to 4CRA-A13-005

Evaluate change and requirement

Check the purpose and effect of Annex I, Part I separately. Arrange transferable documents to the unchanged properties.

Testable evidence
Essential change decision and coverage of four of the six case criteria.
Sample
Replace the control with a smaller display adjustment. The confirmed purpose remains the same. If the test also shows no effect on compliance with Annex I Part I, the change in this variant is not essential. Secure the justified check in the amendment protocol.

Paragraphs 5 and 6CRA-A13-006

Ensure security responsibility for integration

Arrange the library version and the contact person to the manufacturer's dossier. Check a recorded component note for your own concern.

Testable evidence
Proven integration status with verified vulnerability path.
Sample
In the model, let the Foundation also place a self-responsible version of the data logger on the market under its own brand in commercial traffic. Evaluate this activity separately. The possible role of manufacturer for its own offer is due to the new provision, even if it remains free of charge.

Paragraphs 5 to 8CRA-A13-007

Sample replacement and compatibility

Check source, future care and export effect per variant. Distinguish the confirmed replacement assumption from the mere plan.

Testable evidence
44 covered variants and two named gaps.
Sample
For both open variants, submit a contract by the end of 2034 and change the package allocation in the sample to another type of device. The contractual care is documented. Product reference and technical effectiveness remain to be confirmed.

Paragraphs 6, 8 and 17CRA-A13-008

Assigning the finding to the delivery concerned

Check the input, product acquisition, component level and transfer to the right place. Keep track of existing findings about a possible kind. 14- trigger.

Testable evidence
Dated and updateable process protocol with own notification decision.
Sample
Replace the standard request with a concrete, proven consideration after which an immediate detailed publication before use endangers safety. Determine the earliest detectable possibility for application and check again the exception. Keep any Art. 14 requirements separately in the time log.

Paragraphs 8 and 9CRA-A13-009

Identifying the previous user environments from the inventory

Arrange the 48 systems of the delivered software, valid configuration and ongoing maintenance.

Testable evidence
Proven inventory with matching user groups.
Sample
The manufacturer takes care of any necessary adjustment for the 14 plants. However, only 13 changes are possible in the sample sample. Check for the last plant whether there is a practical access. A cost proof alone does not cover the missing functional sample.

Paragraph 10CRA-A13-010

Check access and conversion costs per group

Test retrieval, installation and essential function. Check necessary additional costs of adaptation.

Testable evidence
34 confirmed changes without additional costs and 14 verified deviations.
Sample
The manufacturer takes care of any necessary adjustment for the 14 plants. However, only 13 changes are possible in the sample sample. Check for the last plant whether there is a practical access. A cost proof alone does not cover the missing functional sample.

Paragraph 22CRA-A13-011

Secure the request and the requested version

Capture sender, required response, time base and assignment to the delivered version.

Testable evidence
Full minutes of receipt and time limit.
Sample
Secure receipt of the correct explanation and leave the two non-existent specialist samples. The document topic is documented at this level. The technical remedy remains open.

Paragraph 21CRA-A13-012

Managing the residual portfolio risk-appropriate

For 20 distribution devices, record the security to be demonstrated and for 60 user devices a suitable, scheduled follow-up action. Evaluate withdrawal or recall if necessary.

Testable evidence
Released or kept open measure with residual list and escalation.
Sample
Complete twenty telephone contact attempts without delivery or implementation documents. Communication is better documented. The number of devices with proven success does not change. The open inventory continues to include 80 devices.

Paragraph 11CRA-A13-013

Mark historical versions intelligible

Open a publicly provided archive from a user's perspective. Check supported status, access to updates and risk advice on unsupported software.

Testable evidence
Dated user view protocol with version and hint text.
Sample
Copy the old download page into a new directory and check again which hint remains visible.

Paragraphs 2 to 4CRA-A13-014

The criteria along the actual delivery record

Arrange a test criterion, a responsible person and the ID of the intended product stand for each requirement.

Testable evidence
Six linked criteria with verifiable version reference.
Sample
Complete a signed release note to version 3.2 and leave the old restart report unchanged. The signature confirms the processing. The statement on effect in 3.2 still needs a reliable document.

Paragraphs 2 and 3CRA-A13-015

Keeping the context change comprehensible

Compare warning path, connection dependence and the responsible body in both environments.

Testable evidence
Entry for new use with evidence of the changed conditions.
Sample
Use a permanent connection in the after-test and measure for six minutes. The time is reached in the laboratory. The test-proof connection does not correspond to the new indoor environment. The decision to use this environment remains open.

Paragraphs 2 and 8CRA-A13-016

Establishing the actual product groups

Determine three depot profiles, the test environment and the common criterion for warning.

Testable evidence
Sampling plan with unique group key.
Sample
Complete three more samples from Depot Nord. The total counter reaches nine. For Depot South there is still no valid observation and the overall decision remains open.

Paragraph 21CRA-A13-017

Evaluate the modified protocol with the original scale

Compare the raw times with three minutes. Check the origin of the five-minute limit and the observed function.

Testable evidence
Evidence of the ongoing open post-test for two races.
Sample
Complete nine raw times of no more than three minutes each and accidentally take over the old product status in the report. The times fit to the target. The assignment to the corrected delivery version must be further proven.

Paragraphs 14 and 15CRA-A13-018

Track the confirmed initial profile to line

Open the statement for both issues and compare firmware and actual start profile per device.

Testable evidence
Line-by-line assignment of the twelve output units.
Sample
Provide six suitable laboratory samples with manually adjusted profile. Check whether these tests represent the real device output on the new line. Without this proof, serial release remains open.

Paragraphs 9, 13 and 18CRA-A13-019

Assign type of document and start of period

Retrace technical file and user information to place on the market. Write down the security update's deployment date.

Testable evidence
Three comprehensible time covers with original receipt.
Sample
In the pattern, set the end of support to September 30, 2046. The later end of support will also be decisive for the existing security update. Then check the new storage and access proof.

Paragraphs 9 and 13CRA-A13-020

Determine the longer period

Compare the relevant dates for the three categories and document the computational result.

Testable evidence
File and user information up to 2041 and update at least until 2044 in the sample.
Sample
In the pattern, set the end of support to September 30, 2046. The later end of support will also be decisive for the existing security update. Then check the new storage and access proof.

Paragraphs 8 and 23CRA-A13-021

The current tasks and the stock concerned shall determine:

Capture product capture, open support end, downloads and designated responsible post after setting.

Testable evidence
List of products, user groups and tasks concerned.
Sample
The sales partner confirms the acceptance of the 15 contacts, but sends the information only two days after the appointment. The team can prove the assignment. It has to evaluate the time and still open information before the recruitment separately.

Paragraph 23CRA-A13-022

Determine the communication of authorities and user paths separately

Secure the received government notice and identify 145 proven information channels as well as 15 open contacts.

Testable evidence
Dated assignment with documented contact tests and gaps.
Sample
The sales partner confirms the acceptance of the 15 contacts, but sends the information only two days after the appointment. The team can prove the assignment. It has to evaluate the time and still open information before the recruitment separately.

Paragraphs 17 to 19CRA-A13-023

Determine the binding information on the version offered

Open confirmed support, product identification, short instructions and contact options.

Testable evidence
Released information stand for version 3.2.
Sample
Update the instructions in the example, but leave the wrong support date until after the purchase. Safe use is better described. The information before the purchase is still incorrect.

Paragraphs 2 and 5CRA-A13-024

Determine the actual dependence behind the offers

Arrange performance, technology providers and underlying update access. Secure the dependency with contract or verified information.

Testable evidence
A common dependency point.
Sample
In the pattern, submit a third contract that uses the same update access. The number of contractual partners increases. The independent resumption to be proved remains open.

Paragraphs 2 and 3CRA-A13-025

Collect fields and required events

Arrange each field observed in the test to the justified product purpose. Determine the expected security events and the intended opt-out within the same scope of testing.

Testable evidence
Matched target for data fields, events and operation settings.
Sample
Reduce the transmission to the seven justified fields. Keep only two of the four changes visible in the security protocol. The data sample can now be documented. The protocol criterion remains open.

Paragraphs 2 to 4CRA-A13-026

Check common evidence for portability

Open the original raw reports. After actual coverage, clarify which observations support the CRA stand and where a proof is missing.

Testable evidence
The decision to cover the new lot and the comprehensible inventory for the previous lot.
Sample
Use the same production date for both lots in October. The documented data of the first placing on the market will not change. Continue to check the proof of market availability for the second lot in December.

Paragraphs 8 and 19CRA-A13-027

Practically compare explanation, care and contact

Arrange the documented delivery stand. Check contact response and an example proof of a well-kept component. Compare the confirmed period with the deployment plan.

Testable evidence
Comparison matrix with observed results and concretely open care time.
Sample
Complete an indeterminate statement "Support can be extended in principle" from a sales presentation. Check the liability, version and concrete duration. Without corresponding proof, the comparison level remains at five years.

Supervision instructions and interpretation

Editorial guidanceCRA-FAQ-004

Does the SBOM have to be publicly accessible for each product?

Part II of Annex I requires a well-kept machine-readable list of parts. In addition, it is necessary to check in individual cases which information should be provided to users or competent bodies.

For your exam Compare the internal SBOM and actually published user information.

Editorial guidanceCRA-FAQ-005

When can the availability of an update extend beyond the end of support?

The availability of a security update issued during the support period ends at least ten years after the release or later end of the support.

For your exam Move the end of support beyond the calculated update availability date.

Editorial guidanceCRA-FAQ-008

Is a free download of the latest software sufficient?

In Article 13 paragraph 10, additional adjustments to the existing hardware and software must be documented without additional costs for the affected users. The rule is limited to the specified criterion of vulnerability correction.

For your exam Let one of 48 installations work only after a paid upgrade.

Editorial guidanceCRA-FAQ-014

Do all archive periods start on the same day?

Technical documentation, explanation and user information refer to the placing on the market. An update provided during support has its own trigger. In both cases, compare the longer duration of each.

For your exam Move the date of the update and see which map tag changes.

Editorial guidanceCRA-FAQ-021

Does a general care commitment prove the required useful life in an award?

The criteria and the commitment to the offered delivery status are decisive. The legal justification of the support period and the own benchmark for awarding the contract are documented separately.

For your exam Compare the required duration with the annual data and the actual version reference in the offer.

Editorial guidanceCRA-FAQ-022

Can a data minimisation sample replace the security protocol?

The required data fields and the expected security events answer various test questions. Determine the respective target from purpose and risk assessment. Check also the intended opt-out.

For your exam In the counter sample, reduce telemetry data and check separately whether the expected changes appear in the protocol.

Related provisions

Other official references13

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Official sources

First check for this task

Other official references27