Legacy device with new remote control
An old batch gets a patch, a second one gets a new remote control.
CONFORMITY
MAINTENANCE
Starting position and test order
A manufacturer will provide a batch of building sensors on the Union market for the first time on 15 November 2027. A security update in January 2028 fixes a vulnerability. It does not change the intended use and other product functions in case.
A second January update is intended to allow remote control of devices for the first time. Product management confirms a new intended purpose. Another batch of the old model will be made available on the Union market for the first time in January 2028.
Compare test data and consequences
First batch
- Scale
- Market provision before 11 December 2027
- Observation
- 15 November 2027
- Follow
- Check the stock product
Pure security update
- Scale
- Purpose and other effect unchanged
- Observation
- Only remedy in case evidenced
- Follow
- Transition remains relevant
Remote control and new batch
- Scale
- Own purpose or initial provision
- Observation
- Both confirmed in January 2028
- Follow
- Check General Path
Edit the test step by step
Verify the date of the specific inventory
Arrange each batch using actual market availability. Separate storage date and initial deployment.
Testable evidence Assignment per batch and date.
- Acceptance criterion
- Reconcile expected and observed records using the same identifier. Resolve missing, duplicate or unmatched records individually.
- Evidence
- Reconciliation sheet recording the identifier, expected and observed mapping, source and finding.
Compare the effect of the change
After the update, check the intended purpose and influence on compliance with Annex I Part I. Support patch and new remote control separately.
Testable evidence Reasoned amendment decision per version.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
- Versioned mapping of item, source and approved version with any discrepancy recorded.
Evaluate the reporting path separately
If an incident or use is confirmed, record the trigger separately for the product you have captured. Place the possible old date in the same file.
Testable evidence Reporting check with knowledge time and responsible manufacturer role.
- Acceptance criterion
- Trace execution, review and approval to named roles. Check handover and deputy arrangements in the exercise.
- Evidence
- Roles record naming responsibilities, deputies and documented approval or escalation.
Worked decision and negative test
Decision in case
The pure security update does not lead to any significant change in the assumed case. For the new remote control, the general path is checked because the purpose is changed. The January charge has to be assessed independently of its own initial provision.
The reporting obligation already in force is considered separately for all products covered and an old initial provision does not resolve this test.
Counter-sample and impact
Remove the original January batch and leave only the date of manufacture. The classification remains open until the actual date of placing on the market is established.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
First, you must set the right date. In case of existing products, you also check the transitional rule.
Templates and worksheets
Date and product change
Evaluate initial deployment and modification per product or batch. Perform reporting obligations separately.
Outcome The deadline for the submission of a reasoned transition, own reporting and responsibility.
Read the instructions
Fictional example A security update and a new remote control affect the same old charge. A January charge is first on the market after the deadline.
- Identify the starting situation Enter market entry and change per batch with date and location.
- Run the test assess the purpose and requirement of the specific change.
- Secure decision and evidence The manufacturer shall carry out the reporting test at the approved trigger independent of the transition.
Official sources
First check for this task
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Guidelines for the application of CRA
Check inter alia the remote processing, expected use and delimitation to other legal acts.
Questions on scope and implementation
Use the examples to classify products and make them available on the market.
Other official references1
- Application data and conditions (opens in new tab)
EU-Kommission · Umsetzungsfahrplan
Keep track of the date of application and any relevant transition.
What depends on your result?
Application data and inventory products
Transfer the same test criteria to your own product and save the different starting data.
View the guideReporting route and deadlines
Document the confirmed trigger and actual message for a captured product.
Check the reporting route and deadlines

