DORA · IMPLEMENTATION GUIDE

Explain proportionality

The selected control scope is clearly justified.

ASSESS
APPLY
DOCUMENT

Justify the selected control scope with the specific risk

Consider the size and overall risk profile of the financial entity as well as the nature, scope and complexity of its services, activities and business. Determine which concrete process design follows from it. Check the facts of the simplified framework separately.

A society can operate few systems and still depend on a single platform for time-critical performance. Explain the relationship between actual complexity and desired design. Note how the selected control covers the same relevant impact and what change would trigger a reassessment.

Reasoning for an adapted implementation based on risk

Document business model, risk profile, size and complexity of the specifically affected unit.

The company features are shown

Capture the business model, service offering, essential failure sequences and use of external services. Date the information used and name the responsible body.

Acceptance criterion
Trace execution, review and approval to named roles. Check handover and deputy arrangements in the exercise.
Evidence

A profile with verifiable information on the specific unit.

Depict requirements separately

Describe how a requirement is met in the specific company. In particular, clarify whether relevant regulations themselves provide for exceptions, different obligations or requirements.

Acceptance criterion
A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
Evidence

An assignment of regulation, risk profile, design and evidence.

Defining changes as triggers

Determine which product extension, group change or significant new ICT dependency triggers a review. If necessary, use the result to determine a new justification.

Acceptance criterion
Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
Evidence

A documented resubmission with criteria and responsible persons.

Secure the statement with a sample

Check with a small unit with central payment dependence which design is possible due to short release routes and which default risks still require a test.

Acceptance criterion
Compare two similarly sized entities with different operational dependencies. Justify each simplification by the actual risk and record which function still needs testing.
Evidence
Versioned mapping of item, source and approved version with any discrepancy recorded.
TEST PLAY

A small unit uses a central payment service

Few employees simplify internal coordination. Nevertheless, the failure of the payment service can affect all customers. The unit establishes a short release path and tests the restart based on the actual risk of default.

Released decision basis Assessment, chosen procedure and remaining risks are comprehensible per relevant obligation.

What you are examining
Compare the short release route of the unit with the actually used central payment service. The note must explain which task is performed locally and how the failure of the central service is checked anyway.
What the post-test decides
The sample shall follow a payment until the central service has been confirmed. The establishment shall designate documented responsibilities for feedback and resubmission.
Audit record
Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.

Templates and worksheets

The filler tool is directly under the task. Download the template for editing or open the Quick View.

  • Proportionality note

    Reason the depth of control per business model, size, complexity and proven dependence.

    Outcome A verifiable proportionality note with alternatives and reassessment occasions.

    Read the instructions

    Fictional example A small investment firm operates a business-critical external identity service. A flat-rate size note underestimates an unreplaceable platform.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Evaluate the specific function, examine the simplified framework separately and set the resubmission.

Legal basis for this task

Compare the decision from the test example with the relevant rule.

  • Articles 4 and 16 of the DORA · Proportionality and simplified framework

    Article 4 describes the principles of proportionality. The simplified ICT risk management framework has the addressees regulated in Article 16.

    For your exam Assessment, chosen procedure and remaining risks are comprehensible per relevant obligation.

Transferring tasks of the management body into a decision

Prepare and document a decision of the management body on risk tolerance, budget and monitoring. The assessments on EUGRC.AI are available for internal evaluation.