Regulation (EU) 2022/2554 regulates digital operational resilience in the financial sector. The following entry points lead from the applicable legal framework to the appropriate work page.

First, select a legal entity and a single business task. For a related restoration service, check the documented function, contract reference and test receipt. Determine which part of the decision is covered by the basic act and what question you are looking up in the specific standard.

DORA · Article Register

Art. 7 · Keep ICT systems fit and resilient

Obligation ICT operations and architecture

Systems, protocols and tools must be sufficiently efficient and resilient to the actual extent, reliable and under load.

Test points for basic article

Art. 7 Point a–bObligation

Prove the suitability and reliability of the systems

Arrange used technical components to transaction types, protection requirements and operational requirements.

Testable evidence
System register with clearance status, operational destination and owner.
Sample
Check a highly critical interface with actual volume and error rate.

DORA-A07-001

Art. 7 Point (c)Obligation

Check peak load and expected growth

Dimension and test processing, storage and network at operationally relevant peak volumes. Determine a capacity requirement from trend and thresholds.

Testable evidence
Load test, capacity forecast and decision on measures.
Sample
Combine monthly volume with a reduced operating node and measure the response time.

DORA-A07-002

Art. 7 Point dObligation

Measure operation under fault

Check the ability of the systems used to handle additional processing under stress and adverse conditions.

Testable evidence
Scenario protocol with load, impact and tolerance decision.
Sample
Check the service if a dependency with unchanged professional purpose fails.

DORA-A07-003

Working aids for this Article

  • Capacity planning sheet

    Measure capacity reserves and thresholds under representative peak and replacement loads.

    Outcome Decision on the released load including bottleneck, early warning threshold and follow-up.

    Read the instructions

    Fictional example In a peak phase, the application processes 780 operations per minute. On the replacement path there are 610. 610 operations on the replacement path remain under the approved requirement.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Determine the bottleneck and repeat the load test with unchanged profile after adjustment.
  • Comparison of function and ICT stock

    Control the actual functional and system reference against inventory and department.

    Outcome Missing or duplicate relationships are listed as concrete findings with system evidence.

    Read the instructions

    Fictional example The payment service is based on the application PAY-A and the key service KEY-07. KEY-07 is missing after a technical migration from the target inventory.

    1. Is to compare and Insert independent target and actual lists as text. Declare missing, duplicated and additional identifiers.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Clarification and responsibility from the system change take over and after correction compare both inventory levels.
  • Sheet for resilience targets in the business process

    Determine the distance between resilience target, actual function used and restored data level.

    Outcome A target deviation is comprehensible as a concrete difference and with a professionally tested remedy step.

    Read the instructions

    Fictional example Business impact and customer load start from 90 minutes. Technically usable is the service after 105 minutes. The internal report measures only technical availability after 80 minutes.

    1. Restart and check data Capture restart target, data level, completeness and technical release separately.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Measure up to the confirmed technical usability and decide the deviation with a targeted follow-up test.
Other official references1

Editorial update 2026-11-28 · Geltende Fassung und Zuständigkeit anhand der amtlichen Fundstelle prüfen.

Find the provisions relevant to your task

Select the task to be solved. The location and the practical audit trail lead each to the appropriate destination.

Who's on the map?

Start with the legally proven status. In a second step, clarify the risk framework and other obligations.

Acceptance criterion
For each entity, record the activity and legal reference supporting applicability. Use the assessment date.
Evidence
Test record with transaction, expected business result, observed effect and finding decision.

How is the frame supported?

Use a business performance as a sample. The framework must be comprehensible up to the valid procedure and the responsible role.

Acceptance criterion
Trace the requirement for a business service to the current procedure and responsible role.
Evidence
Roles record naming responsibilities, deputies and documented approval or escalation.

When will a malfunction become a report case?

Document observation, classification and dispatch based on their own time records.

Acceptance criterion
Place awareness, classification and dispatch evidence on a timeline. Review events against a common time basis.
Evidence
Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.

How is the effectiveness tested?

Link test scope, applicable requirements and verifiable remedy.

Acceptance criterion
Assign an observable business objective to the test. A finding needs documented remediation and a comparable retest.
Evidence
Reasoned applicability assessment recording facts, reference, role, date and open assumptions.

What follows from the reference of an ICT service?

Use the specific performance as a starting point. In addition, check the meaning of the supported function.

Acceptance criterion
Link the service used and function supported to the service schedule and corresponding operational evidence.
Evidence
Agreement reconciliation linking the service, current clause, operating evidence and decision on any discrepancy.

Understand the rule in your own case

Select a legal entity, function and task. Determine relevant articles, responsible role and practical proof in one line.

Test criterion Another person can find the request and the accompanying document on the basis of your note.

Official sources

First check for this task

Other official references3

What is the next decision?

Deepen the concrete work path with a sample. In the DORA legal register you will find the neighbouring sources if the decision touches another standard.

DORA Register

The source path leads from validity and risk framework to reporting procedures, information registers and resilience tests. For each reference point you will find out what it is needed for.

Determine the DORA treatment for a legal entity

Registration or registration certificate, actual performance description, organizational chart and list of participations.

Arrange the legal person and his actual activity. A note per legal entity combines authorisation or registration, possible exceptions, the applicable risk framework and the competent authority.

Work result The validity mark with the category checked, status certificate, framework and trigger of re-examination.

Your result Decision-making endorsement with source of authorisation, activity, result, open points and link to the information register.