DORA · IMPLEMENTATION GUIDE

Plan controls and tests

Link test dates and change events.

DEADLINE
TRIGGER
EVIDENCE

Connecting rule dates and changes in the test calendar

Link the inventory of critical or important functions to the controls and tests provided. For each activity, you will determine the basis, maturity or triggering event, the role responsible and the evidence expected.

An annual re-start test checks the scheduled time limit. If the storage platform changes during the current year, a further sample for the changed performance path may be necessary. The plan should show for an examining person which date is assigned to which occasion and which evidence.

Connect controls, changes and resubmissions

Use function inventory, test overview and open findings. Consider both recurring dates as well as concrete triggers.

  1. Assign function and scope

    Arrange systems, locations and third-party services to the functions you are looking at. Capture test items and existing coverage.

    Testable supporting evidence Functional test planning with dependencies.

  2. Differentiating dates from occasions

    Determine whether the time-limits and events are different, such as major changes. Deposit who triggers the reassessment upon entry.

    Testable supporting evidence Calendar with fixed date or unique trigger condition.

  3. Controling progress through evidence

    Link report, findings and follow-up to the planned activity. Complete representation and test criteria for tasks with high dependence.

    Testable supporting evidence Closed checkpoint with result and responsible role.

Secure the statement with a sample

Change the date of the memory change in the pattern. The annual plan must show when the additional test and its professional release take place.

TEST PLAY

Exercise case with new memory

The re-start test stands for the current year in the calendar. A memory change changes the technical dependence. The bank complements a sample related to the change for detection and restoration.

Annual calendar for release The planning shall specify the function, occasion, procedure, date, responsibility and expected evidence for each check point.

What you are examining
Remove the relevant service and the scheduled time for the change of memory from the amending file. The annual plan shall indicate both the existing inspection and the additional test task that is triggered by it.
What the post-test decides
Change the alternate date by trial. The additional test and the partition release must be tracked in the calendar, as well as the rule date independent of the change.

A memory change can trigger an additional test

Link the regular test date to the triggers from the change practice. Determine scope and decision for an additional test.

A targeted restart test is added to the regular annual plan after a relevant memory change.
A targeted restart test is added to the regular annual plan after a relevant memory change.

Templates and worksheets

The filler tool is directly under the task. Download the template for editing or open the Quick View.

  • Planning sheet for check dates and change announcements

    Connect the rule date and event trigger to the same responsibility and check failed execution.

    Outcome A list of events leads from the occasion to test reports and independent monitoring of the effect.

    Read the instructions

    Fictional example The annual plan includes a restore test, an infrastructure change shifts the risk level earlier. The annual test is still considered to be up-to-date, although the platform has changed.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Capture the additional test regardless of the year and track the due date until the documented completion.

Legal basis for this task

Compare the decision from the test example with the relevant rule.

  • Article 8(1) and Article 24 DORA

    Compare the standard requirements for inventory check and test program with your planning case. Check the relevant scope of application and the specifics according to function and company.

    For your exam The planning shall specify the function, occasion, procedure, date, responsibility and expected evidence for each check point.

Merge test evidence

To merge control, sample, findings, correction and release in a file. For internal evaluation, the assessments on EUGRC.AI are available.