Critical thresholds for water supply
Appendix sheet with assignment and type of measured values.
IMPLEMENTATION
EVIDENCE
Check drinking water supply and KRITIS threshold separately
A water supplier may be identified as a BSIG facility. The classification of a particular water plant as a critical installation requires additionally the correct plant category, unit quantity and reference period according to the applicable regulation.
Perform the verification task
Delimit the concrete installation
Arrange operators, waterworks and power. Check separate volume acquisition as well as the requirements of a common plant. If there are different types of plants, determine the group first.
- Acceptance criterion
- Use the same metric, population and unit for expected and observed results. Record the measurement point at which the business service is achieved.
- Evidence
Appendix sheet with assignment and type of measured values.
Confirm supply level
Match the confirmed annual amount with the correct line of the attachment. Use the treated drinking water quantity for the water plant and document the calculation path, release and time of the status change.
- Acceptance criterion
- Use the same metric, population and unit for expected and observed results. Record the measurement point at which the business service is achieved.
- Evidence
Annual balance and confirmed threshold decision.
Assigning consequences to the operation
Determine the control systems, monitoring and actual supply functions dependent on the plant. Connect the status with protection, notification and official proof.
- Acceptance criterion
- Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
- Evidence
Protection and detection plan for the confirmed installation.
The confirmed measurement value of 22.4 million cubic metres of treated drinking water is above the threshold of 22 million. The invoiced delivery of 21.8 million is a different measure for the plant category Wasserwerk.
Starting position, assessment and counter-test
Situation A water supplier may be identified as a BSIG facility. The classification of a particular water plant as a critical installation requires additionally the correct plant category, unit quantity and reference period according to the applicable regulation.
Situation
The fictitious Wasserwerk Nord prepares 22.4 million cubic meters of drinking water in the calendar year. The controlling number of 21.8 million cubic meters measures only the tax charged to tariff customers. The annual balance with confirmed measuring point shows the difference.
Evaluation and decision
For the associated plant category, the treatment exceeds the threshold of 22 million cubic metres. The note checks the status on 1 April of the following year and leads to the classification of the facility as its own test point.
Negative test for your own operation
Set the confirmed processed quantity to exactly 22.0 million cubic meters. The threshold is reached. Note why the billing amount in the waterworks case does not replace the threshold decision.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
Help for your decision
Vote for annual measurement, double-recorded internal transfers and the actual plant category. Calculate the confirmed processing amount against the threshold.
Supply quantity and threshold in the waterworks
Vote for annual measurement, double-recorded internal transfers and the actual plant category. Calculate the confirmed processing amount against the threshold.
Outcome Adjusted supply volume with measuring certificate, threshold level and date for the own plant test.
Read the instructions
Fictional example A plant shows 22.4 million cubic metres of treated drinking water. In a second case, a seemingly higher total quantity after cleaning up internal double counting drops to 21.3 million.
- Determine the installation category and time period Capture waterworks, calendar year, operator and the confirmed processing quantity in cubic meters.
- A double counting Determine each internal transfer with measurement event and test document.
- Prepare status decision Compare the adjusted analysis and the calculated reference date with the existing system status.
Obligation and detection matrix
Document legal decisions per institution and performance. Check each proof whether the scope, status, access and statement support the assigned obligation.
Outcome Reasoned obligations and comprehensible decisions on the use of common evidence.
Read the instructions
Fictional example N10 · Bank and ICT service providers use the same technical protocol. A bank position remains open until their own business sample. Case N12 shows the separate assignment of common systems.
- Legal decision per obligation Capture confirmed entities, activity, exact reference, decision, role and deadline.
- Check the proof under the same identifier Link position and document form. Confirm evidenced depth of information and actual retrievability.
- Release your own evaluation Keep in mind who has released the use and what proof is missing.
Legal basis for the verification task
First check for this task
§ 3 BSI-KritisV · Critical services in the water sector
Arrange the actual performance of drinking water supply or wastewater disposal and the appropriate plant category. Only check the respective design size and threshold afterwards.
Annex 2 BSI-KritisV · Level of supply and thresholds in the water sector
Compare year, quantity unit and the appropriate category. For water plants, a threshold of 22 million cubic meters of treated drinking water per year applies. Consider the determination until 31 March and the regulation on the status change on 1 April.
§ 28 BSIG · Particularly important and important institutions
Check legal form, actual paid activity, type of facility, size values and special cases. § 28 para. 5–8 alters the scope of obligations for certain activities or institutions.
Other official references3
- § 39 BSIG · Proof of critical installations (opens in new tab)
Deutsche Anwendung · BSIG
Determine the concrete BSI determination, classification as a new or existing operator and an appropriate exception. Plan scope of examination, handover and remedy open defects.
- Appendix 1 BSIG · Sectors and types of equipment according to Appendix 1 (opens in new tab)
Deutsche Anwendung · BSIG
Compare the real service with the specific type of facility and its legal definition. Check size level and special rules for basically relevant activities.
- § 31 BSIG · Additional requirements for critical installations (opens in new tab)
Deutsche Anwendung · BSIG
Limit the systems that are relevant to the functioning of the affected installation. Check additional risk-appropriate precautions and the effectiveness of attack detection.
Next step for your editing level
First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.
Secure official detection time for critical installations
§ 39 BSIG distinguishes the first, new and transferred operator constellations. The calculation helps with the planning. For the own plant the time specified by the BSI is recorded with the correct official document.
The relevant plant status is established. The date of the verification is to be secured.
The plan shall include the assignment per installation, the identified legal case, the confirmed date and the early steps for supporting documents, verification and submission.
Your decision A reasoned date from the relevant detection route with documented starting point.
Work through the caseRead Appendix 1 and 2 from activity
They work in parallel on tasks from the same department.
Starting point Contracts, current performance description and an example of the actual activity performed.
The overview will classify further audit orders and aids.
Work result The service is assigned to a occupied type of facility. Open questions of specialist law receive their own order.