NIS2 legal register
Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.
IMPLEMENTATION
EVIDENCE
Which legal area answers the question?
For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.
NIS2 · Standards Register
§ 5d EnWG · Documentation, registration and incident reporting
Addressee Operator according to § 5c para. 1 sentence 1 No. 1 to 3 EnWG
Distinguishingly the documentation of the catalogue for the Federal Network Agency, registration with the BSI and the reporting stages to the reporting point according to § 32 BSIG. For existing energy supply network operators outside the BSIG categories, paragraph 4 states 6 March 2026 as a statutory event date.
Measures, evidence and sampling
Paragraphs 1 and 4NIS2-ENE-004
Keep catalogue proof and registration as separate operations
Check the case-related transmission of the documentation to the Federal Network Agency and the relevant registration at BSI. Determine the event date, contact point and supporting documents.
- Testable evidence
- Separate dispatch and receipt references with operator role and relevant legal basis.
- Sample
- Check the process of a stock network below the BSIG size values. The document must also be found without a general BSIG category.
Paragraph 3NIS2-ENE-005
Evidence of time and reporting point for an energy incident
Check relevance according to § 2 Nr. 11 BSIG, the reporting levels according to § 5d and the correct transmission route. Separate start of failure and time of knowledge.
- Testable evidence
- Incident chronology with effect on safe operation and transmission references.
- Sample
- Let a representative's knowledge and 24-hour or 72-hour limit be re-deduced from the supporting documents.
Paragraph 3NIS2-WAS-003
EWG notification and BSIG system report can be mapped in a comprehensible manner
Confirm knowledge time and relevance for each performance concerned. Check the appropriate channel and additional equipment information. Determine the input reference and the delivery reference.
- Testable evidence
- Event reference with own decision per legal basis, correct transmission and asset reference.
- Sample
- Play the case with time-shifted knowledge in net and water service in the alarm clock.
Supervision instructions and interpretation
Editorial guidanceNIS2-FAQ-ENE1
What catalogue does an already recorded network operator use?
The Federal Network Agency describes on its definition page which previous specifications for existing addressees continued. Check publication, entry into force and addressees of a new specification separately and document the catalog status.
For your exam Select a protection requirement and link it to the published status applicable to the operator.
Official supervisory noteNIS2-FAQ-ENE2
How are registration and reporting of digital energy services assigned?
The Federal Network Agency explains the registration of recorded operators with the BSI and their own legal reporting reference for incidents. The data received during the registration is transmitted by the BSI to the Federal Network Agency in accordance with § 5d para. 4 EnWG.
For your exam Confirm the correct registration reference for a facility and keep the responsible office for notifications.
Editorial guidanceNIS2-FAQ-WAS1
How to treat a shared platform for grid and water?
Check the actual role of the platform for the functioning of the critical water system and the safe operation of the energy network. For the affected water operation, the own requirements and impact of the incident must be demonstrated.
For your exam Arrange a raw document for both functions and check which own acceptance per function is missing.
Related provisions
Other official references4
- Register and choose the correct reporting path (opens in new tab)
BSI · Information for NIS2 and MIP
The notice distinguishes NIS2 registration in the BSI portal, notifications and transitional use of MIP by certain groups.
- Questions on digital energy services (opens in new tab)
Federal Network Agency · IT security for digital energy services
Check the registration office, catalogue status and reporting reference on the basis of official questions and legal facts.
- IT security catalogues for energy operators (opens in new tab)
Federal Network Agency · Determination according to § 5c para. 2 EnWG
Check the position of the operator, the published definition and the version applicable for the reference date. The Federal Network Agency explains the continuation of the old catalogues for previous users until a new catalogue is published.
- Critical plants and drinking water supply (opens in new tab)
§ 3 BSI-KritisV · Laws on the Internet
Check the actual installation and the date-by-date classification using the category and threshold in Annex 2. Support which IT is required to function.
Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.
Acts and official implementing aids
First check for this task
BSI Act as amended
Check the German obligation for the actual activity performed, the legal entity and the relevant time.
NIS2 Directive
The European framework shall explain the origin of the duties and tasks of Member States, authorities and bodies.
Technical requirements and criteria for relevance
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
Other official references1
- Technical implementation assistance to the implementing regulation (opens in new tab)
ENISA · Technical Implementation Guidance, Juni 2025
Use examples of evidence and assignments for testing. The benchmark for the binding requirement remains the relevant legal act.
Checking or preparing your own proof
State of change
A change in the legal situation is to be included in the audit order.
Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.
Work result The amendment note shows when and how it was reviewed.
Templates and worksheets
They want to collect their own data and capture a verifiable result.
Use calculated work aids to process classification, implementation, reporting deadlines and evidence.

