NIS2 · LEGAL SOURCES

NIS2 legal register

Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.

SCOPE
IMPLEMENTATION
EVIDENCE

Which legal area answers the question?

For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.

NIS2 · Standards Register

§ 5d EnWG · Documentation, registration and incident reporting

Addressee Operator according to § 5c para. 1 sentence 1 No. 1 to 3 EnWG

Distinguishingly the documentation of the catalogue for the Federal Network Agency, registration with the BSI and the reporting stages to the reporting point according to § 32 BSIG. For existing energy supply network operators outside the BSIG categories, paragraph 4 states 6 March 2026 as a statutory event date.

Measures, evidence and sampling

Paragraphs 1 and 4NIS2-ENE-004

Keep catalogue proof and registration as separate operations

Check the case-related transmission of the documentation to the Federal Network Agency and the relevant registration at BSI. Determine the event date, contact point and supporting documents.

Testable evidence
Separate dispatch and receipt references with operator role and relevant legal basis.
Sample
Check the process of a stock network below the BSIG size values. The document must also be found without a general BSIG category.

Paragraph 3NIS2-ENE-005

Evidence of time and reporting point for an energy incident

Check relevance according to § 2 Nr. 11 BSIG, the reporting levels according to § 5d and the correct transmission route. Separate start of failure and time of knowledge.

Testable evidence
Incident chronology with effect on safe operation and transmission references.
Sample
Let a representative's knowledge and 24-hour or 72-hour limit be re-deduced from the supporting documents.

Paragraph 3NIS2-WAS-003

EWG notification and BSIG system report can be mapped in a comprehensible manner

Confirm knowledge time and relevance for each performance concerned. Check the appropriate channel and additional equipment information. Determine the input reference and the delivery reference.

Testable evidence
Event reference with own decision per legal basis, correct transmission and asset reference.
Sample
Play the case with time-shifted knowledge in net and water service in the alarm clock.

Supervision instructions and interpretation

Editorial guidanceNIS2-FAQ-ENE1

What catalogue does an already recorded network operator use?

The Federal Network Agency describes on its definition page which previous specifications for existing addressees continued. Check publication, entry into force and addressees of a new specification separately and document the catalog status.

For your exam Select a protection requirement and link it to the published status applicable to the operator.

Official supervisory noteNIS2-FAQ-ENE2

How are registration and reporting of digital energy services assigned?

The Federal Network Agency explains the registration of recorded operators with the BSI and their own legal reporting reference for incidents. The data received during the registration is transmitted by the BSI to the Federal Network Agency in accordance with § 5d para. 4 EnWG.

For your exam Confirm the correct registration reference for a facility and keep the responsible office for notifications.

Editorial guidanceNIS2-FAQ-WAS1

How to treat a shared platform for grid and water?

Check the actual role of the platform for the functioning of the critical water system and the safe operation of the energy network. For the affected water operation, the own requirements and impact of the incident must be demonstrated.

For your exam Arrange a raw document for both functions and check which own acceptance per function is missing.

Related provisions

Other official references4

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Acts and official implementing aids

First check for this task

Other official references1

Checking or preparing your own proof

State of change

A change in the legal situation is to be included in the audit order.

Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.

Work result The amendment note shows when and how it was reviewed.

Templates and worksheets

They want to collect their own data and capture a verifiable result.

Use calculated work aids to process classification, implementation, reporting deadlines and evidence.