NIS2 · LEGAL SOURCES

NIS2 legal register

Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.

SCOPE
IMPLEMENTATION
EVIDENCE

Which legal area answers the question?

For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.

NIS2 · Standards Register

§ 28 BSIG · Particularly important and important institutions

Addressee Per institution and activity

Check legal form, actual paid activity, type of facility, size values and special cases. § 28 para. 5–8 alters the scope of obligations for certain activities or institutions.

Measures, evidence and sampling

Paragraphs 1 and 2NIS2-DE28-001

Delimiting the legal entity and real performance

Per institution, record the external activities and their actual operating mode. Arrange each plausible activity from the specific number of Appendix 1 or 2 and justify open cases.

Testable evidence
Performance matrix with legal entity, contract, proof of operation, installation and type of facility.
Sample
Track an invoice about ongoing system administration to the contractual partner and the actual performance.

Paragraph 1(4) and (2)(3)NIS2-DE28-002

Calculate size thresholds in a separate way

Check the number of employees regardless of the financial path. In the financial path, turnover and balance sheet total must be above the relevant limit. Check the type of facility before the category.

Testable evidence
The number sheet with underlying qualification, annual work units and calculation method per unit.
Sample
Calculate 249 employees, 60 million. EUR turnover and exactly 43 million EUR balance sheet total as a limit case.

Paragraph 4NIS2-DE28-003

Involve partners and related companies

Clear out participation and dominant influence. In principle, calculate partners proportionately and add all associated companies according to the recommendation. Avoid double recording of consolidated values.

Testable evidence
The participation plan, reference financial statements, documented shares and calculation per indicator.
Sample
Calculate a case with 30% partner share and a controlled entity separately.

Para. 4 sentence 2NIS2-DE28-004

Prohibited IT independence

Evaluate legal, economic and actual factors as well as the operation and nature of IT. Include roles, administration paths and common default dependencies in the decision.

Testable evidence
Reasoned exemption with performance agreements, architecture and actual operational responsibility.
Sample
Check a change in who can administer or block a central identity account.

Paragraphs 1 to 3 and 2 to 1 to 2NIS2-DE28-005

Check size-independent and custom size rules

Evaluate critical assets, DNS, TLD registers and qualified trust services regardless of the normal size path. Check non-qualified trust services and publicly available telecommunications according to their own rules.

Testable evidence
Assignment of suitable supplier and installation documents to the relevant facts.
Sample
Compare a small DNS service provider to an ordinary small hosting company without a DNS service.

Paragraph 3NIS2-DE28-006

Justification of negligible activity

Check the importance and scope of the entire business on the basis of appropriate criteria. Determine the method, period of consideration and triggers of a reassessment.

Testable evidence
Note with turnover and activity, dependencies, release and resubmission.
Sample
Check whether a new contract overtakes the old note for negligible activity.

Paragraph 5NIS2-DE28-007

Telecommunications and energy distribution by specialist legal means

Arrange the obligations that have been imposed on the specific network, plant or energy services. Determine further types of facilities, critical installations and the legal treatment of ancillary activities separately.

Testable evidence
Obligation matrix with service, affected systems, § 28 para. 5, technical standard and competent procedure.
Sample
Check which assignment changes with a telecommunications provider with an additional managed IT service.

Paragraphs 6 and 7NIS2-DE28-008

DORA and other exceptions to be mandatory

Check the exempt regulations and remaining obligations individually with the financial company. Arrange Group IT and a possible operation of an investment for the financial company according to its own role.

Testable evidence
Matrix of legal entities, activity, legal basis, regulatory exception and remaining task.
Sample
Compare financial institution, separately operating MSPs of the same group and an operator according to paragraph 7.

Paragraph 4 and Annex Article 4 of the SME RecommendationNIS2-DE28-009

Confirm the date and reference periods

Secure the relevant financial statements and check the relevant periods and causes when changing size class. If you change your participation, you will assess the correct data base separately.

Testable evidence
Final data with previous periods, consolidation status and decision-making endorsement.
Sample
Calculate a one-time border crossing and check with a takeover, which is why a separate evaluation is necessary.

Paragraph 8NIS2-DE28-010

Checking the country's legal classification in individual cases

Clear the institutions, administrative tasks, relevant prerequisites and concretely integrated national rules. Check separately the separately offered commercial performance.

Testable evidence
Attribution note with institution, national fund and activity concerned.
Sample
Check two units of the same public institution with different services.

Paragraph 6(1)NIS2-PFL-001

Enter the DORA exception per obligation and legal entity

Secure the financial company's proof of validity and mark the BSIG regulations referred to in paragraph 6 per specific obligation. Check registration and other facts separately.

Testable evidence
Assignment with authorisation and validity certificate for the financial undertaking and separate entry for the service provider.
Sample
Compare the banking path for § 32 with the independently assessed reporting obligation of the managed provider.

Paragraph 7NIS2-PFL-004

Evidence of the installation reference to the limited reporting exception

Determine the scope of § 28 paragraph 7 for § 32 on the basis of proven facts. You can also determine the scope of the company's operations, associated companies and the specific relation to the financial enterprise.

Testable evidence
Note with installation, operator, contract and relevant provision.
Sample
Check whether a pure service contract or proven operation of the installation in question is documented.

Paragraph 5, first and second sentencesNIS2-MEL-001

Distinguishing public TK service and additional MSP performance

Arrange both services for the proven activity and the relevant status of concern. Support the service for which the TKG and for which further activity the BSIG is relevant.

Testable evidence
The definition of benefits and the justified reporting method per activity concerned.
Sample
Compare the role of public Internet access with the separate managed customer service in case N11.

Paragraph 5, second and third sentencesNIS2-WAS-001

Assigning allocated IT to another critical installation

Determine which components and processes are required for the functionality of the additionally operated water system. Continue to assign energy obligations to the affected grid operation.

Testable evidence
Functional system delimitation and obligation note for each installation.
Sample
Compare a central exchange platform with a comparable pure information view without affecting the water function.

§ 28 BSIGNIS2-ARB-001

Delimitation of legal entities and benefits

Select three orders from the same product family. Read the contract and service description, identify operators and recipients and agree to the assignment with billing and business directory. Hold the viewing period, change of supplier and, if necessary, a standalone group performance.

Testable evidence
A coordinated portfolio of services with legal entities, investment position, period and evidence or open decision per performance.
Sample
Remove the service attachment. Move the second assignment to an open clarification order on purchase and operation until the actual activity is documented.

§ 28 BSIGNIS2-ARB-002

Deriving size values in the group of companies

First, record accounting and employees in each relationship in the group sheet. Check whether a number is already included in a consolidated basis. Document the legal basis for inclusion and any independence that can be taken into account in the specific case of network and information systems and services.

Testable evidence
A freed calculation path with a definition of consolidated values and a reproducible basis for the category.
Sample
Remove the documents from the partner dataset and confirm the result number only after matching the source data and the actual assignment. Check separately the decision with the exact employee limit value.

§ 28 BSIGNIS2-ARB-003

Clear special cases before size testing

Support service definition, actual operation and if necessary confirmation as operator of a critical installation. Enter the separate activity and its legal basis in the classification report. If applicable, check § 34 and § 60 BSIG next to the category.

Testable evidence
Reasoned special case with supporting documents and separately documented registration and reporting obligations.
Sample
Change the number of employees of the confirmed DNS provider only. Check whether this changes the relevant special item. Arrange the German reporting path separately.

§ 28 BSIGNIS2-ARB-034

Establishing independence in the group

First, determine the values according to the regular rules for partner and affiliate companies. In addition, indicate what change would result from the verified independence. Check on the actual performance, such as identity management, operation, support, alternate paths and decision-making rights. Use performance attachments, operating approvals and a documented test of failure. Have legal and operational responsibility check the proofs of independence. Also specify which change in the joint operation triggers a reassessment.

Testable evidence
The release contains the regular calculation method and the technical justification, which group-wide connections are decisive for the actual independence. If an essential connection remains unexplained, the deviation remains visible as an open decision point.
Sample
Change the technical basis to an independently operated registration with confirmed failure sample. Then check which of the other services and systems depend on the group. The new sample only replaces the proof for registration.

§ 28 BSIGNIS2-ARB-035

Keep separate operator change and mandatory start

Make a contract, operator release and actual takeover. Name the contact person for operation and notification in a handover matrix per period. Check the category and applicable registration procedure for purchasers and sellers. Take up the confirmed first or reclassification as well as relevant changes with their respective times. Have an exercise notice followed during the transition of both standbys. Check handover, receipt and clear clearance of the notification decision.

Testable evidence
For each period of time, it is documented who provides the service, which registration or change must be checked and which body evaluates an incident in transition.
Sample
Move the operation release by one day if the contract is unchanged. Identify who actually operated, gained knowledge and released the decision on April 1.

Supervision instructions and interpretation

BSI orientationNIS2-FAQ-01

Can the BSI's assessment of the substance make it compulsory to determine the classification?

The evaluation is based on the own answers and serves as a guide. The legal criteria and the actual activity remain decisive.

For your exam Secure the answers together with performance figures and figures. Let a disputed case be evaluated professionally.

EU GuidelinesNIS2-FAQ-06

What effect does equivalent sectoral Union law have?

Comparable requirements may replace the relevant NIS2 requirements for the institutions concerned. The Commission describes the obligation-based comparison. DORA and the national exemption must be examined separately according to the specific rules.

For your exam Create an assignment of protection, reporting and registration requirements for a group company separately from another group company.

Editorial guidanceNIS2-FAQ-07

How are group values understood?

The reference in § 28 para. 4 BSIG assumes the SME recommendation with expressly mentioned deviations. Within the calculation, participation, influence, already consolidated information and a possible IT independence must be examined separately.

For your exam Calculate the same values once as your own and once with the correctly weighted group value. Support the applied level.

Editorial guidanceNIS2-FAQ-GES1

What remains to be checked for 29.999 full-station cases?

For the approved hospital facility alone, the number does not reach the threshold of No. 1.1. Continue to check the plant cut and other affected facilities. Consider § 391 SGB V as well as the separate BSIG classification of the facility.

For your exam Have the case taken separately from the classification decision by legal entity.

Editorial guidanceNIS2-FAQ-PFL1

Which BSIG obligations must be examined separately by the financial undertaking?

For the financial company concerned, take the exceptions specified in § 28 para. 6. Check requirements of other regulations per obligation. Evaluate its own activities and the respective basis for validity from the provider.

For your exam Check the two reporting and registration lines for bank and service providers on the basis of their own facts.

Editorial guidanceNIS2-FAQ-WAS1

How to treat a shared platform for grid and water?

Check the actual role of the platform for the functioning of the critical water system and the safe operation of the energy network. For the affected water operation, the own requirements and impact of the incident must be demonstrated.

For your exam Arrange a raw document for both functions and check which own acceptance per function is missing.

Related provisions

Other official references13

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Acts and official implementing aids

First check for this task

Other official references1

Checking or preparing your own proof

State of change

A change in the legal situation is to be included in the audit order.

Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.

Work result The amendment note shows when and how it was reviewed.

Templates and worksheets

They want to collect their own data and capture a verifiable result.

Use calculated work aids to process classification, implementation, reporting deadlines and evidence.