NIS2 legal register
Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.
IMPLEMENTATION
EVIDENCE
Which legal area answers the question?
For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.
NIS2 · Standards Register
Annex 5 BSI-CritisV · Thresholds and turn of the year in the health sector
Addressee Plant operators in stationary supply, medical and medical device supply and laboratory diagnostics
Confirm the system delimitation, design size and reference period. For a hospital approved, the threshold of 30.000 is valid for full-patient cases per calendar year. Determine the level of care by 31 March of the following year and check 1 April and any joint facilities if you change the threshold.
Measures, evidence and sampling
Part 1 Nos 2 and 3, Part 3 No 1.1NIS2-GES-004
Check full-station cases and follow-up year
Secure the confirmed case population of the previous calendar year. Document the determination and the applicable start or drop of status in a threshold change.
- Testable evidence
- The competent authority shall be responsible for the coordination of exports, balances, date and clearance.
- Sample
- Compare 29.999 and 30.000 admissible cases. In addition, test that no status is released in an unexplained source.
Part 1 No 4NIS2-GES-005
Joint installation on the holding
Check the spatial and operational context and the common critical service for the same type of plant. Calculate case numbers and clean up overlaps.
- Testable evidence
- The system report, confirmed individual populations and a comprehensible comparison of the common case number.
- Sample
- In the case of exercise, remove confirmation of the common system. The calculation path must not output a combined classification.
Supervision instructions and interpretation
Editorial guidanceNIS2-FAQ-GES1
What remains to be checked for 29.999 full-station cases?
For the approved hospital facility alone, the number does not reach the threshold of No. 1.1. Continue to check the plant cut and other affected facilities. Consider § 391 SGB V as well as the separate BSIG classification of the facility.
For your exam Have the case taken separately from the classification decision by legal entity.
Editorial guidanceNIS2-FAQ-GES2
When are two locations to be assessed together?
Check § 1 BSI-KritisV and the special requirements of Annex 5 Part 1 No. 4 for plants of the same kind. A joint sponsorship alone does not decide on the installation question. Reason for the examined close spatial and operational connection.
For your exam Compare the documented facilities and the common service before merging the case populations.
Related provisions
Other official references2
- Approved hospitals (opens in new tab)
§ 108 SGB V · Laws on the Internet
Determine the basis of approval for the hospital facility considered, and in Annex 5 to the BSI-KritisV it is part of the definition.
- Installation delimitation and joint installation (opens in new tab)
§ 1 BSI-KritisV · Laws on the Internet
Reason category, operational context and critical service provided together. In addition, check the sector-specific criteria of the relevant annex.
Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.
Acts and official implementing aids
First check for this task
BSI Act as amended
Check the German obligation for the actual activity performed, the legal entity and the relevant time.
NIS2 Directive
The European framework shall explain the origin of the duties and tasks of Member States, authorities and bodies.
Technical requirements and criteria for relevance
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
Other official references1
- Technical implementation assistance to the implementing regulation (opens in new tab)
ENISA · Technical Implementation Guidance, Juni 2025
Use examples of evidence and assignments for testing. The benchmark for the binding requirement remains the relevant legal act.
Checking or preparing your own proof
State of change
A change in the legal situation is to be included in the audit order.
Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.
Work result The amendment note shows when and how it was reviewed.
Templates and worksheets
They want to collect their own data and capture a verifiable result.
Use calculated work aids to process classification, implementation, reporting deadlines and evidence.

