Substantiate critical infrastructure reports
Service and Appendix Form for notification.
IMPLEMENTATION
EVIDENCE
Prepare additional information for a critical installation concerned
If a significant incident has or may have an impact on a critical installation, § 32 para. 3 BSIG contains additional information. The service effect can be unclear at the beginning although the installation and its potential impairment are already plausible.
Perform the verification task
Identifying the plant function
Link the identification code from the system directory to the critical service. Name which effect exists, which is conceivable and which observation it confirms.
- Acceptance criterion
- Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
- Evidence
Service and Appendix Form for notification.
Fill in additional information from confirmed sources
Include quantities, time and supplied areas only with confirmed reference size. Note open questions with the time of the next update.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
Released reporting data with source and time.
Check specific reporting route and reception
Take over the current reporting path from the current official requirements for your own institution. Check responsibility and receipt of each submitted version.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
Cover chain on the appropriate incident report.
The performance sample records access, data and technical processing as separate dependencies. In the example, the professional approval remains open as long as it needs the failed main service.
Check the decision in the example
Situation
A fictitious water operation loses the central display of a pump group. The operation continues on site initially. The operator can explain the technical reasons for an impairment of the drinking water supply in case of further disturbance and shows the confirmed observations as well as the forecast separately.
Evaluation and decision
The report contains the affected plant, including critical service and a comprehensible assessment of its impact. The later measurement complements the consideration of supply without rewriting the original state of knowledge.
Negative test for your own operation
Please note that only a separate training system was affected. Check the plant effect separately and document the confirmed decoupling.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
Help for your decision
Support knowledge, reporting levels and recipients. Calculate the 24-hour and 72-hour limits as well as the monthly receipt.
Decision of incident and reporting deadlines
Support knowledge, reporting levels and recipients. Calculate the 24-hour and 72-hour limits as well as the monthly receipt.
Outcome Chronology with separate right triggers, maximum limits, shipping and reception.
Read the instructions
Fictional example A significant incident is reported around 09:30 UTC. The incident report is sent 50 hours later. The conclusion follows calendarly from the actual message. In case of an ongoing incident, the progress must be made first.
- Evidence Identify the relevant time, service concerned, competent body and facts.
- Select stages and exceptions Document regular hours profile, trust service review and individual process separately.
- Check calendar limit and shipping Technically confirm the monthly limit and special cases. Organise immediate transmission and secure all receipts.
Operating effects and restart order
Arrange operational consequences and restart targets per performance. Calculate necessary parallel and subsequent steps against the internal target
Outcome Prioritized performance with comprehensible restart chain and visible target deviations.
Read the instructions
Fictional example N18 · The target of the order service is 90 minutes. The operational dependence takes 70 minutes, the subsequent handover 35 minutes.
- Coordinating objectives Set tolerable interruption, restart target and data loss.
- Count order Confirm the parallel requirements and the duration of the subsequent professional transfer.
- Sharing time and data Compare the calculated values and open evidence for the organizational decision.
Legal basis for the verification task
First check for this task
§ 32 BSIG · Reporting of significant incidents
The early first report and the incident report are linked to the knowledge of the significant incident. The monthly reference follows the actual reported incident report. In case of a continuous incident, the reporting level changes.
§ 31 BSIG · Additional requirements for critical installations
Limit the systems that are relevant to the functioning of the affected installation. Check additional risk-appropriate precautions and the effectiveness of attack detection.
§ 40 BSIG · Central Reporting and Contact Point
Determine which reporting body, which BSI feedback and which sectoral supervision are relevant for your activity.
Other official references1
- § 36 BSIG · Feedback from the BSI (opens in new tab)
Deutsche Anwendung · BSIG
You can carry out feedback, case identification, shipping and reception times as well as queries per reporting level. Separate feedback, possible official notices and your own deadline.
Next step for your editing level
Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.
Check drinking water supply and KRITIS threshold separately
A water supplier may be identified as a BSIG facility. The classification of a particular water plant as a critical installation requires additionally the correct plant category, unit quantity and reference period according to the applicable regulation.
The installation boundaries on which the additional information is based must be checked.
The category of the device and the system status are two findings. The test and detection date has a proven basis.
Your decision An appendix with a comprehensible quantity calculation and a reasoned result for each operator.
Work through the caseReport security incident
They work in parallel on tasks from the same department.
The overview will classify further audit orders and aids.
View the guide