CRA · IMPLEMENTATION GUIDE

Data minimisation and security logs

Reason the data selection and check which security events are recognizable in the protocol.

PRODUCT
CONFORMITY
MAINTENANCE

What you decide and prove

Set purpose and data inventory for the specific profile used. Reason required data fields based on their effect. Check with the supplied version which fields are stored locally, transmitted or processed in a necessary remote function.

Determine the security events to be observed from risk and purpose. Check the appropriate recording or monitoring and the intended opt-out. Evaluate the limitation of telemetry and the handling of safety-related information on your own criteria.

Edit the test step by step

  1. Collect fields and required events

    Arrange each field observed in the test to the justified product purpose. Determine the expected security events and the intended opt-out within the same scope of testing.

    Testable evidence Matched target for data fields, events and operation settings.

    Acceptance criterion
    Justify applicability using evidenced activity or intended use, role and date. Assign an owner and due date to any unresolved assumption.
    Evidence
    Reasoned applicability assessment recording facts, reference, role, date and open assumptions.
  2. Compare actual processing and protocol

    Perform the four agreed changes with test data in the shared environment. Compare recorded fields and events to expectations.

    Testable evidence Raw observation per field and event at the actual delivery point.

    Acceptance criterion
    A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.
  3. Check correction per cause

    Remove or justify the additional fields. Support the missing security events and repeat the control sample to set.

    Testable evidence Post-test protocol with separate results and confirmed version.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.

One meter sends too much data and logs too little

A fictitious provider provides networked measuring devices for a building service. The standard profile required seven documented fields for its purpose. A test with shared sample data shows that the connected service processes 20 fields. Responsibility for 13 additional fields is not clarified in the test file.

The team checks four agreed changes to device settings and roles on the same device profile. Two entries appear in the security protocol. The other two changes cannot be reconstructed there. The operator sample confirms the intended opt-out setting for the security protocol.

What you'll find out in the case

Supported decision on data fields and security events with separate correction orders.

Editing the Practice Case

Templates and worksheets

  • Data inventory and safety protocol in the product

    Compare required data fields and expected security events with the actual observed profile.

    Outcome Separate data minimisation findings, safety protocol and opt-out.

    Read the instructions

    Fictional example 20 instead of seven fields are processed. Two expected entries are missing.

    1. Identify the starting situation Purpose, set required data and security events.
    2. Run the test Sample actual data path and protocol on the delivery profile.
    3. Secure decision and evidence Document separate corrections and re-use sample.

Official sources

What depends on your result?

  • Update Risk Assessment at Use

    Review if the product is used for a different purpose and thus change data or expected security events.

    View the guide
  • Test matrix Annex I

    Bind information protection, data minimisation and security protocol to separate test points in Annex I.

    Use the test matrix