CRA · LEGAL SOURCES

CRA article register

Find articles and annexes with links to official wording and checks for your product.

PRODUCT
CONFORMITY
MAINTENANCE

From CRA article to verifiable proof

The register opens up all 71 articles and eight annexes. Start with the article number, a keyword or a legal area. You will find concrete test orders, counter-samples, case examples and linked work equipment on practical topics.

Use the test matrix for a systematic examination of Annex I. For market reference, publication or continuation, open the linked official find site in the version relevant to your date of reference.

Requirements and test points

CRA · Article Register

Annex I · Connect product requirements and vulnerability treatment

Addressee Development, product maintenance and testing

Arrange the requirements of product effect or vulnerability treatment. Also check the machine-readable SBOM.

Measures, evidence and sampling

Part ICRA-ANHI-001

Sample the delivery status

Check eight individual devices without any device already being installed. Keep track of the profile and origin of the device.

Testable evidence
Six matching observations and two separate findings.
Sample
Perform eight suitable first starts in the laboratory and leave the old version ID in the release dossier at the same time. The content of the results is documented in the exercise, the assignment to the delivered stand remains to be confirmed.

Part II, No 1CRA-ANHI-002

Match the parts list with the delivery package

Compare component and version line by line. Capture the missing library with reference to the delivery manifest.

Testable evidence
Deviation, not a mere completeness rate.
Sample
Complete the ninth position with the library version from the test system. The number is correct, but the version balance keeps the position open until confirmation.

Part IICRA-ANHI-003

Connect Note and Product Status

Secure the input, package or SBOM reference and the affected versions. Determine possible and confirmed effects.

Testable evidence
Product reference with documented source and time base.
Sample
Change the last observation so that the operator receipt is assigned to another product version and no further usage documents are available. Complete the version explanation and check the reporting branch again.

Part I, point 2, point (h) and (l)CRA-ANHI-004

Check conformity and timely warning

Test the six locations with the same measurement and time base. Evaluate whether the modified effect affects compliance.

Testable evidence
Six individually assigned observations and documented change effects.
Sample
In the sample sample, set all warning times to a maximum of 55 seconds and leave the feedback in the laboratory. Proof of warning time is now fulfilled. The relapse test and thus the release remain open.

Part II, No 1CRA-ANHI-005

Deriving the affected population from delivery

Determine the delivered version identifier and the package stand associated with the affected component per variant.

Testable evidence
List of 46 comprehensiblely affected variants and locations.
Sample
For both open variants, submit a contract by the end of 2034 and change the package allocation in the sample to another type of device. The contractual care is documented. Product reference and technical effectiveness remain to be confirmed.

Part II, Nos 7 and 8CRA-ANHI-006

Supporting the planned update path

Identify delivered device, status before update and released download including user notice.

Testable evidence
Proof that the same version is delivered and tested.
Sample
If you detect a confirmed rejection, leave the proof of the warning function after the update empty. Update acceptance and protection against the unsuitable package are observed. The release of effects remains open due to the lack of functional evidence.

Part II, No 3CRA-ANHI-007

Monitoring adoption and effect

Log the installation for each of the four sample devices and confirm the warning function based on previously defined observations.

Testable evidence
Four positive samples with a frame and functional documentation.
Sample
If you detect a confirmed rejection, leave the proof of the warning function after the update empty. Update acceptance and protection against the unsuitable package are observed. The release of effects remains open due to the lack of functional evidence.

Part II, Nos 4 to 8CRA-ANHI-008

The date of publication and the grounds for exceptions

Document the actual correction available. Evaluate any delay on a comprehensible risk basis with resubmission.

Testable evidence
Dated publication protocol or concretely justified and verified exception.
Sample
Replace the standard request with a concrete, proven consideration after which an immediate detailed publication before use endangers safety. Determine the earliest detectable possibility for application and check again the exception. Keep any Art. 14 requirements separately in the time log.

Part I, point 2, point (h)CRA-ANHI-009

Evaluate the risk by means of an appropriate evidence of action

Link the replacement warning to the requirement and the pre-confirmed time scale. Arrange the sample of the target environment.

Testable evidence
Observation of 18 minutes at eight minutes.
Sample
Use a permanent connection in the after-test and measure for six minutes. The time is reached in the laboratory. The test-proof connection does not correspond to the new indoor environment. The decision to use this environment remains open.

Part II, No 3CRA-ANHI-010

Compare planned and actual coverage

Open the source documents. Arrange the six valid observations to the two tested profiles.

Testable evidence
Covered by two of the three groups.
Sample
Complete three more samples from Depot Nord. The total counter reaches nine. For Depot South there is still no valid observation and the overall decision remains open.

Part II, No 3CRA-ANHI-011

Ensure the original criterion and the result

Capture nine target cases, the three-minute scale, version reference and the two faulty observations.

Testable evidence
Continuously detectable findings to the original target.
Sample
Complete nine raw times of no more than three minutes each and accidentally take over the old product status in the report. The times fit to the target. The assignment to the corrected delivery version must be further proven.

Part I, point 2(b)CRA-ANHI-012

The two deviations are correctly limited

Return the serial identifiers to the station and the profile used there. Check independently whether further batches are affected.

Testable evidence
The extent of the error, not the general nature of the release.
Sample
Provide six suitable laboratory samples with manually adjusted profile. Check whether these tests represent the real device output on the new line. Without this proof, serial release remains open.

Part ICRA-ANHI-013

Distinguishing common raw data and own impact

Link the remote access observation to the CRA. Check separately whether the secure system condition is occupied.

Testable evidence
Separate statements on access testing and machine effect.
Sample
Complete a valid machine test report for version 2.3. The safe condition is observed there. Check the transferability for 2.4 and decide whether a new observation is necessary.

Part I, point 2, point (h)CRA-ANHI-014

Test independent restart

Compare the observed restart without the service concerned with the previously agreed scale.

Testable evidence
18 hours and ten hours above the target.
Sample
In the pattern, submit a third contract that uses the same update access. The number of contractual partners increases. The independent resumption to be proved remains open.

Part I, point 2(b)CRA-ANHI-015

Refund and determine the scope of the action

Arrange device, product acquisition, old clients and necessary remote function. Set safe starting values and the expected extinguishing effect before the sample.

Testable evidence
Checklist with serial numbers, desired final condition and test reference.
Sample
Resetting two devices successfully and showing the empty local measurement window. Make the previous account visible again. As long as the old assignment is confirmed, the passing of these units remains blocked.

Part I, point 2, point (d) and (m)CRA-ANHI-016

Deletion and separation of account

Perform the documented return using the instructions. Capture data and settings in the device as well as the status of the old assignment. Confirm the safe start when rerecorded.

Testable evidence
Separate original documents to device, old connection and new recording.
Sample
Resetting two devices successfully and showing the empty local measurement window. Make the previous account visible again. As long as the old assignment is confirmed, the passing of these units remains blocked.

Part I, point 2, point (g) and (l)CRA-ANHI-017

Compare actual processing and protocol

Perform the four agreed changes with test data in the shared environment. Compare recorded fields and events to expectations.

Testable evidence
Raw observation per field and event at the actual delivery point.
Sample
Reduce the transmission to the seven justified fields. Keep only two of the four changes visible in the security protocol. The data sample can now be documented. The protocol criterion remains open.

Part I, point 2(e), (f), (g) and (l)CRA-ANHI-018

Check correction per cause

Remove or justify the additional fields. Support the missing security events and repeat the control sample to set.

Testable evidence
Post-test protocol with separate results and confirmed version.
Sample
Reduce the transmission to the seven justified fields. Keep only two of the four changes visible in the security protocol. The data sample can now be documented. The protocol criterion remains open.

Part I, point 2, point (h) and (i)CRA-ANHI-019

Local operation and takeover testing

Secure the confirmation of each booking. After reconnecting, compare the list of unique operations with the initial list and record duration and observed load.

Testable evidence
Sheet with missing and multiple recorded events as well as time reference.
Sample
Capture 80 records in 14 minutes, but two of them are part of the same process identifier. Evaluate the sample by the number of unique initial operations. The total number of records does not change the missing coverage.

Part II Vulnerability managementCRA-ANHI-020

Document deviation and operator sequence

Keep track of your own assessment status and the clarification permitted by the award rules. Arrange additional operational evidence required for the responsible role.

Testable evidence
Dated decision with gap, location and further processing.
Sample
Complete an indeterminate statement "Support can be extended in principle" from a sales presentation. Check the liability, version and concrete duration. Without corresponding proof, the comparison level remains at five years.

Part I, point 2(b)CRA-ANHI-023

Secure start profile and reset

Check the standard configuration and return to the intended initial state on the delivered product. If necessary, check the agreement for a customized product for a commercial user.

Testable evidence
Delivery sample and confirmed reset sample per product profile.
Sample
Use the user guide with a device that shows an old account assignment after returning it.

Part I, point 2(c)CRA-ANHI-024

Check effective security updates and operating options

Test the correction by a security update. Check the default setting, information as well as opt-out and delay for the relevant automatic update.

Testable evidence
Update protocol with version, rehearsal and documented user control.
Sample
Repeat the control sample on the standard profile and check access to the available update.

Part I, point 2, point (e)CRA-ANHI-026

Prove confidentiality in the actual data path

Collect data that is in need of protection when storing, transferring and processing. Arrange the verified protection measure to the actual data paths.

Testable evidence
Data flow with a free scale and observation per relevant path.
Sample
Check the intended export or the necessary remote processing in the same profile.

Part I, point 2, point (f)CRA-ANHI-027

Integrity and signal evidence in case of deviation

Document how authorized changes are detected. Check the intended response and message using a test artifact marked as inappropriate in the approved test setup.

Testable evidence
Evidence of acceptance, referral and notification for the same product status.
Sample
Repeat the sample for the corrected delivery level and compare the logged reason.

Part I, point 2(g)CRA-ANHI-028

Limit actual processing to required data

Reason the required fields for each purpose and compare the confirmed processing in the device and its necessary remote function.

Testable evidence
Data inventory with purpose and comprehensible measurement per profile.
Sample
In the post-test, only change the fields transmitted and check whether the profile continues to fulfil its purpose.

Part I, point 2, point (i)CRA-ANHI-030

Limiting effects on other devices and networks

Set a specific load limit for affected neighbouring services. Compare their observed effect in operation and reconnection.

Testable evidence
Timely observation of the adjacent service in the defined load profile.
Sample
In the post-test, check not only your own resumption but also the reaction of the downstream service.

Part I, point 2, point (j)CRA-ANHI-031

Minimizing unnecessary interfaces and functions

Compare the interfaces required for the product purpose with the shared delivery configuration and justify each additional function provided.

Testable evidence
Interface inventory with condition, purpose and observation on the delivery profile.
Sample
Compare the published manual with the actual standard profile provided.

Part I, point 2, point (l)CRA-ANHI-033

Confirming security events and opt-out

Define the relevant accesses and changes for the purpose. Check protocol or monitoring and the intended opt-out on the specific product profile.

Testable evidence
Matching the test plan with documented events and confirmed operation of the setting.
Sample
Check a successfully executed change for which no entry is visible in the security protocol.

Part I, point 2, point (m)CRA-ANHI-034

Check permanent deletion and secure transfer

Watch the deletion effect for data and settings. If a transfer is provided, check the documented protection of this path.

Testable evidence
Confirmed extinguishing sample and, if necessary, transfer receipt on the delivery profile.
Sample
Check which data and assignments of the old use remain after the intended return process.

Part II, No 1CRA-ANHI-035

Tracking components and vulnerabilities

Compare the machine-readable parts list at least for direct dependencies with the delivered stand and perform known vulnerabilities assigned.

Testable evidence
Version-bound software piece list with comprehensible component origin and findings.
Sample
Compare the product file with a library that is directly used and which is missing in export.

Part II, No 2CRA-ANHI-036

Quickly fix vulnerabilities and limit updates

Track risk classification, remedy and release. Check whether safety and function changes can be provided separately.

Testable evidence
Dated vulnerability files with associated update or comprehensible justification of the bundling.
Sample
Compare the package change with the pure correction scope and needs of affected users.

Part II, point 4CRA-ANHI-038

Publish information about the fixed vulnerability

Connect update availability with understandable information on the version concerned, impact, severity and remedy. Document any justified delay with a new decision.

Testable evidence
proof of the update and information to be verified, published or dated.
Sample
Check the actual access path for affected users in a new proposal to postpone.

Part II, No 6CRA-ANHI-040

Ensure achievable exchange of information

Check the published contact possibility, responsibility for the product and the information path to affected component partners.

Testable evidence
Observed test contact and comprehensible assignment with product and component reference.
Sample
Send a clearly agreed as test request via the published channel and document its assignment.

Part II, No 7CRA-ANHI-041

Secure update distribution on the product

Check the intended distribution path, the assignment to the delivery stand and the reaction to a package defined as not suitable in the test process.

Testable evidence
Test certificate for successful acceptance and correct rejection as well as the subsequent product effect.
Sample
Use your own shared test artifacts for the counter-test and confirm the actual situation.

Part II, No 8CRA-ANHI-042

Secure updates and user advice on time

Support time, access and understandable action information. Consider the requirements for a different cost agreement with the customized product for commercial users.

Testable evidence
Dated update offer with visible access, required information and documented cost.
Sample
Open the way with a planned inventory profile and check actual usability and remedy information.

Supervision instructions and interpretation

Editorial guidanceCRA-FAQ-004

Does the SBOM have to be publicly accessible for each product?

Part II of Annex I requires a well-kept machine-readable list of parts. In addition, it is necessary to check in individual cases which information should be provided to users or competent bodies.

For your exam Compare the internal SBOM and actually published user information.

Editorial guidanceCRA-FAQ-008

Is a free download of the latest software sufficient?

In Article 13 paragraph 10, additional adjustments to the existing hardware and software must be documented without additional costs for the affected users. The rule is limited to the specified criterion of vulnerability correction.

For your exam Let one of 48 installations work only after a paid upgrade.

Editorial guidanceCRA-FAQ-009

When can the publication be postponed?

The exception path needs a concrete security balance and refers to the possibility of using the patch. You assess a mandatory message and required information for affected users by your own reporting branch.

For your exam Replace the risk statement in your file with a request from the sales department.

Editorial guidanceCRA-FAQ-013

Are all passed tests of a group sufficient to release the total stock?

A test program must cover the relevant conditions and product variants. Describe the planned scope, valid samples and observed effect separately.

For your exam Complete a successful sample from an already recorded group instead of one from the missing group.

Editorial guidanceCRA-FAQ-021

Does a general care commitment prove the required useful life in an award?

The criteria and the commitment to the offered delivery status are decisive. The legal justification of the support period and the own benchmark for awarding the contract are documented separately.

For your exam Compare the required duration with the annual data and the actual version reference in the offer.

Editorial guidanceCRA-FAQ-022

Can a data minimisation sample replace the security protocol?

The required data fields and the expected security events answer various test questions. Determine the respective target from purpose and risk assessment. Check also the intended opt-out.

For your exam In the counter sample, reduce telemetry data and check separately whether the expected changes appear in the protocol.

Related provisions

Other official references10

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Official sources

First check for this task

Other official references27