Document supply-chain dependencies
Check technical protection and actual dependencies in the same supply chain.
CONFORMITY
MAINTENANCE
What you decide and prove
Determine which third party component or operational performance actually supports product maintenance or a required function. Check the proven responsibility, dependencies behind a replacement offer and the resumption in the concrete operating model.
In the context of the relevance of a cybersecurity risk in the market surveillance process, the Authority also takes into account non-technical risk factors according to Art. 54 para. 2. Include dependencies, instruction and exchange rights that can be determined for your own audit task as well as relevant confirmed requirements.
Regulated customers check their procurement and replacement options according to the respective rules applicable to them. A common technical observation can be used. Decision, legal reference and remaining responsibility are expressly stated per organization.
Edit the test step by step
Determine the actual dependence behind the offers
Arrange performance, technology providers and underlying update access. Secure the dependency with contract or verified information.
Testable evidence A common dependency point.
- Acceptance criterion
- Trace the commitment from the current agreement or amendment to the service actually used. Record discrepancies as specific conditions or open contractual points.
- Evidence
- Agreement reconciliation linking the service, current clause, operating evidence and decision on any discrepancy.
Test independent restart
Compare the observed restart without the service concerned with the previously agreed scale.
Testable evidence 18 hours and ten hours above the target.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
- Evidence list recording original source, version, documented mapping and owner.
Ensure effect, legal relevance and procurement decision
Set correction and re-test for a viable path. Separate the responsibility of the manufacturer from the decision of regulated customers.
Testable evidence verifiable remedial action with handover per organisation.
- Acceptance criterion
- Repeat the decisive test using the same measurement basis. Identify the changed condition and compare the result and approval with the first run.
- Evidence
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
The update path works and the independent recovery takes too long
The manufacturer of networked measuring instruments receives from a special provider the provision of verified updates. Two service providers named as replacement depend on the same operator of the update access after confirmed supplier analysis.
The controlled restart without this affected access takes 18 hours. A regulated customer expects a maximum of eight hours according to its established internal specification. In the case of the technical function of the available main route is confirmed beforehand.
A reasoned supply chain decision with concrete action, responsibility and own proof per organisation.
Editing the Practice CaseTemplates and worksheets
Test supply chain dependency and recovery
Compare proven dependence and real observed recovery with the confirmed scale.
Outcome A comprehensible decision on the replacement route and evidence of each role involved.
Read the instructions
Fictional example Two replacement offers share the same access. Resumption takes 18 instead of eight hours.
- Identify the starting situation Apparently separate providers are checking for their actual dependencies.
- Run the test Evidence of effect and resumption on the basis of equal conditions
- Secure decision and evidence Secure procurement decision, open action and shared evidence.
Official sources
First check for this task
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Guidelines for the application of CRA
Check inter alia the remote processing, expected use and delimitation to other legal acts.
NIS2 Directive on supply chain security and coordinated risk assessments
For a regulated buyer, in particular Article 21 and the relevant assessments under Article 22 shall be relevant.
Other official references1
- DORA: Management of the third party ICT risk (opens in new tab)
EUR-Lex · Verordnung (EU) 2022/2554
Arrange service, affected function, contractual obligations and alternative options to the specific customer.
What depends on your result?
Assigning evidence between DORA and NIS2
A regulated customer shall take the same determination into account in its own test and detection method.
View the guideReplace third component with discontinued care
In case of termination or failure, clarify the actual care supply per delivered variant.
View the guide