Eight records lost after reconnection
A commodity reader records 80 test operations offline.
BUFFER
RECOVERY
Starting position and test order
A networked goods reader performs local bookings for the inventory. The necessary remote function assigns them to the common inventory. The acceptance simulates a pre-determined interruption. All 80 test bookings must be locally usable and, after reconnection, appear in the common inventory in no more than 20 minutes and without double recording.
The device confirms all 80 operations during the period shown. After 14 minutes, the service displays 72 unique bookings. Eight are missing. In the 72 transactions accepted, the examiner will not find any duplications. The neighbouring test application remains in the agreed load range.
Compare test data and consequences
Replacement operation
- Scale
- 80 confirmed local audit bookings
- Observation
- 80 confirmed
- Follow
- Local effect demonstrated
Resumption within target
- Scale
- Not more than 20 minutes
- Observation
- 14 minutes observed
- Follow
- Time criterion respected
Clear total stock
- Scale
- 80 clear bookings provided
- Observation
- 72 allocated, 8 missing
- Follow
- Re-examined acquisition required
Check time limit and inventory separately
The duration is in the target example. For release, the comparison must confirm all 80 unique processes.
Edit the test step by step
Define for interruption and reconnection
Vote product profile, period, observable local effect, allowable duration and the counting base.
Testable evidence Test plan with unique process identifiers and selected load limit.
- Acceptance criterion
- Use the same metric, population and unit for expected and observed results. Record the measurement point at which the business service is achieved.
- Evidence
- Measurement record with baseline population, source, expected and observed values, unit and timestamp.
Local operation and takeover testing
Secure the confirmation of each booking. After reconnecting, compare the list of unique operations with the initial list and record duration and observed load.
Testable evidence Sheet with missing and multiple recorded events as well as time reference.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
- Evidence list recording original source, version, documented mapping and owner.
Partial findings and open criteria document
Confirm confirmed partial effects. Keep the follow-up test for complete and unambiguous acceptance open.
Testable evidence Decision by criterion and clearly limited re-order.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
- Evidence list recording original source, version, documented mapping and owner.
Worked decision and negative test
Decision in case
The time limit and local replacement operation are met. Eight missing bookings prevent the release of the reconnection. The complete common inventory must be documented in the next run via the unique identifiers.
The test facility links the result to the device, remote sensing and load profile. A subsequent retest can thus compare the same product effect.
Counter-sample and impact
Capture 80 records in 14 minutes, but two of them are part of the same process identifier. Evaluate the sample by the number of unique initial operations. The total number of records does not change the missing coverage.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
Templates and worksheets
Replacement operation and complete readmission
Check a necessary remote function using clear procedures before, during and after a controlled interruption.
Outcome Acceptance protocol with inventory, duration, duplication and impact on further services.
Read the instructions
Fictional example 80 operations are confirmed locally. 72 are clearly taken over in 14 minutes.
- Identify the starting situation Set time limit and unique test procedures.
- Run the test Measure local observation, duration and net take-over separately.
- Secure decision and evidence Keep the detection limit and check corrected status.
Official sources
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Responsibility of manufacturers of digital products
Compare preparation, product release and care with your own manufacturer role.
Guidelines for the application of CRA
Check inter alia the remote processing, expected use and delimitation to other legal acts.
What depends on your result?
Check remote function and restart
Transfer the same test criteria to your own product and save the different starting data.
View the guideRe-route necessary remote processing
Check the operator change additionally when version, responsibility or environment of the remote function change.
View the guideTest replacement operation and return to regular supply
Determine your own service targets and operational resumption samples from the product records for a captured operator.
View the guide