DORA · LEGAL SOURCES

DORA article register

Find the relevant DORA article and follow it to practical checks and supporting evidence.

SOURCE
APPLICATION
EVIDENCE

Determine the relevant articles for your business task

Regulation (EU) 2022/2554 regulates digital operational resilience in the financial sector. The following entry points lead from the applicable legal framework to the appropriate work page.

First, select a legal entity and a single business task. For a related restoration service, check the documented function, contract reference and test receipt. Determine which part of the decision is covered by the basic act and what question you are looking up in the specific standard.

DORA · Article Register

Art. 17 · Treating ICT incidents in a uniform manner

Obligation Incident Management and ICT Risk

Capture incidents and significant cyber threats, evaluate them in a comprehensible manner and connect reaction, communication and root cause removal.

Test points for basic article

Art. 17 Paragraph 1Obligation

Set up incident process in a cross-rolling manner

Determine detection, recording, treatment and completion. Connect service desk, security operations, specialist processes and compliance with unique handover.

Testable evidence
Process and roll plan with a executed case.
Sample
Reconstruct from the first entrance to the documented final decision.

DORA-A17-001

Art. 17 Paragraph 2Obligation

Identifying incidents and significant threats

Use unique references, timings, system and function reference. Keep analysis causes and remedies available.

Testable evidence
Incident and threat registers with source reference and remedial tracking.
Sample
Compare several linked events to a common situation and documented cause.

DORA-A17-002

Art. 17 Article 3(a)–bObligation

Incorporating early indicators and classification into the process

Define indicators, prioritization and severity criteria and check the link to classification according to Art. 18.

Testable evidence
List of indicators, escalation protocol and justified classification.
Sample
Compare the classification before and after receiving a confirmed functional reference.

DORA-A17-003

Art. 17 Article 3(c)–dObligation

Organise responsibility, exchange and escalation bindingly

Make roles and representation clear each scenario. Link internal escalation, external communication and recovery.

Testable evidence
Role and address matrix, time stamp and confirmed receipt.
Sample
Play a handover from ICT operations to reporting coordination at an edge time.

DORA-A17-004

Art. 17 Article 3(e)–fObligation

Serious incidents and restart to the line and operation

Document information to the line, impact, reaction and steps to restore expertise.

Testable evidence
Management information, restart receipts, open remedies.
Sample
Check whether both status and residual risk have been presented in case of missed recovery time.

DORA-A17-005

Specific technical requirements

2024/1774 · Art. 22Technical test

Matching the Incidents Directive against Proceedings and Actual File

Keep record, escalation, responsibility, analysis and, if necessary, evidence-proofing documented. Link rule and operational execution.

Testable evidence
Versioned incident policy and comprehensible documented process.
Sample
Reconstruct the treatment of an incident including process references and handovers.

DORA-A17-006

Working aids for this Article

  • DORA Incidental file and notification decision

    Perform the evidence, classification and handover to the reporting officer in an incident file.

    Outcome The classification can be calculated at each point of knowledge and repeated in the decision-making protocol.

    Read the instructions

    Fictional example A supervised financial service is affected. The downtime is 142 minutes, the geographical reference is initially open. A second cross-border affected state is initially only suspected.

    1. Check classification Support the Art. 6 alternatives and each relevant threshold criterion individually.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Keep the review version, verify the new information and check the trigger for a new classification.
  • Alarm delivery test protocol

    Check alarm, transmission route and processing with specifically triggered test signals.

    Outcome The time and delivery sample shows alarm cause, receiver, escalation and proven fix.

    Read the instructions

    Fictional example During a controlled test, a memory error creates an event. The primary channel is silent unplanned. In the event system there is an alarm, with the receiver no confirmation is available.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Follow delivery and escalation after correction with unchanged test signal and independent time source.
  • Decision minutes of the incident classification

    Check the alternatives for a critical service and additional categories of materiality with your own evidence.

    Outcome A comprehensible classification shows open criteria, special access and the branch for subsequent reassessment.

    Read the instructions

    Fictional example A supervised financial service is affected. Downtime and affected states are collected independently. Duration and downtime were wrongly counted as two criteria.

    1. Check classification Support the Art. 6 alternatives and each relevant threshold criterion individually.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Count only once per threshold category. Check whether additional facts change the classification.
  • Transfer sheet for incident reports

    Keep actual transmission, updated data and open information together.

    Outcome The acceptance document and internal release are assigned to each reporting stage and the same incident identifier.

    Read the instructions

    Fictional example Interim report and updated interim report are submitted on different days. A draft was marked as sent, without receipt or shipping time.

    1. Recalculate deadlines Get knowledge, classification and actual transmissions in UTC. Check exceptions and immediate updates separately.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Adjust the steps with the actual transmission and calculate the subsequent periods again.
  • Overview of the ICT risk framework

    Arrange guidelines, controls, independent audit and reports to the same framework.

    Outcome A versioned framework documentation combines risk target, implemented control and periodic efficacy test.

    Read the instructions

    Fictional example The management approves a new risk cap for ICT operations. The test program continues to refer to the old target version.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Determine the effective status, correct the reference and prove the application of the new limit in the plant.
  • Support index for repeatable test

    Create a repeatable index that holds together target criterion, sample, source and responsible rating.

    Outcome A second person may re-examine the examination without additional knowledge using the same referenced files.

    Read the instructions

    Fictional example A test protocol refers to a log extract whose file name remained unchanged after filing while the version was updated. The log proof shows the status instead of during the checked time window.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Secure the original version and keep the results up to approved release.
  • Planning sheet for check dates and change announcements

    Connect the rule date and event trigger to the same responsibility and check failed execution.

    Outcome A list of events leads from the occasion to test reports and independent monitoring of the effect.

    Read the instructions

    Fictional example The annual plan includes a restore test, an infrastructure change shifts the risk level earlier. The annual test is still considered to be up-to-date, although the platform has changed.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Capture the additional test regardless of the year and track the due date until the documented completion.
Other official references4

Editorial update 2026-11-28 · Geltende Fassung und Zuständigkeit anhand der amtlichen Fundstelle prüfen.

Find the provisions relevant to your task

Select the task to be solved. The location and the practical audit trail lead each to the appropriate destination.

Who's on the map?

Start with the legally proven status. In a second step, clarify the risk framework and other obligations.

How is the frame supported?

Use a business performance as a sample. The framework must be comprehensible up to the valid procedure and the responsible role.

When will a malfunction become a report case?

Document observation, classification and dispatch based on their own time records.

How is the effectiveness tested?

Link test scope, applicable requirements and verifiable remedy.

What follows from the reference of an ICT service?

Use the specific performance as a starting point. In addition, check the meaning of the supported function.

Understand the rule in your own case

Select a legal entity, function and task. Determine relevant articles, responsible role and practical proof in one line.

Test criterion Another person can find the request and the accompanying document on the basis of your note.

Official sources

First check for this task

Other official references3

What is the next decision?

Deepen the concrete work path with a sample. In the DORA legal register you will find the neighbouring sources if the decision touches another standard.

DORA Register

The source path leads from validity and risk framework to reporting procedures, information registers and resilience tests. For each reference point you will find out what it is needed for.

Determine the DORA treatment for a legal entity

Registration or registration certificate, actual performance description, organizational chart and list of participations.

Arrange the legal person and his actual activity. A note per legal entity combines authorisation or registration, possible exceptions, the applicable risk framework and the competent authority.

Work result The validity mark with the category checked, status certificate, framework and trigger of re-examination.

Your result Decision-making endorsement with source of authorisation, activity, result, open points and link to the information register.