DORA article register
Find the relevant DORA article and follow it to practical checks and supporting evidence.
APPLICATION
EVIDENCE
Determine the relevant articles for your business task
Regulation (EU) 2022/2554 regulates digital operational resilience in the financial sector. The following entry points lead from the applicable legal framework to the appropriate work page.
First, select a legal entity and a single business task. For a related restoration service, check the documented function, contract reference and test receipt. Determine which part of the decision is covered by the basic act and what question you are looking up in the specific standard.
DORA · Article Register
Art. 9 · Verify protective mechanisms in operation
Obligation Information security and ICT operations
The article combines continuous monitoring with concrete protection areas. RTS 2024/1774 specifies the implementation.
Test points for basic article
Art. 9 Paragraph 1Obligation
Continuously monitor the security status
Define operational indicators, managers and escalations per protection mechanism. Include availability and data integrity.
- Testable evidence
- Monitoring plan, measured values and processed deviation.
- Sample
- Track an off-set protection component from monitoring to efficacy testing.
DORA-A09-001
Art. 9 Paragraphs 2–3Obligation
Risk-based dimensioning of protective measures
Determine measures from classification and threat. Check the four protection targets in peace, use and transfer.
- Testable evidence
- Control allocation per data flow with efficacy assessment.
- Sample
- Check a confidential data exchange for transmission protection and access restriction.
DORA-A09-002
Art. 9 Paragraph 4(a)Obligation
Implement Information Security Directive
Define applicable controls for releases, data and ICT assets based on their classification.
- Testable evidence
- Directive with specific control requirements and control protocol.
- Sample
- Compare a data classification with the actual protection rules.
DORA-A09-003
Art. 9 Article 4(b)Obligation
Secure network and infrastructure separation
Define safety zones and procedures for the isolation of relevant compounds. Support that affected components can be separated without unacceptable consequences.
- Testable evidence
- Zone model, released rules and controlled separation sample.
- Sample
- Verify a planned separation using shared operating and communication channels.
DORA-A09-004
Art. 9 Article 4(c)Obligation
Limit access to justified functions
Apply access restrictions to logical and physical access. Check the purpose, permission and withdrawal requested.
- Testable evidence
- Permission matrix, approval, expiry date and withdrawal certificate.
- Sample
- Compare the exit of a person with remaining accounts and physical accesses.
DORA-A09-005
Art. 9 Paragraph 4(d)Obligation
Prove authentication and key control
Select appropriate authentication and encryption. Define the life cycle of cryptographic keys, backup and response to compromise.
- Testable evidence
- Access concept, key register and logged change.
- Sample
- Check validity, responsibility and relapse plan for a critical certificate.
DORA-A09-006
Art. 9 Article 4(e)Obligation
Control changes
Capture, test, approve and verify changes with a comprehensible risk reference. Make emergency changes to a downstream review.
- Testable evidence
- Update file with test, relapse option and release.
- Sample
- Check a memory change to see how sharing and actual configuration are connected.
DORA-A09-007
Art. 9 Paragraph 4(f)Obligation
Control patches and updates by risk
Define evaluation, deadline, test and release. Highlight rejected or delayed updates with compensatory action and date.
- Testable evidence
- Update file with risk assessment, implementation and follow-up.
- Sample
- Track a known operational weakness from the input to the correction or accepted exception.
DORA-A09-008
Specific technical requirements
2024/1774 · Art. 2Technical test
Transfer security requirements to effective controls
Set the scope, responsibility, release, feedback and handling of exceptions. Measure the actual application using controlled documents.
- Testable evidence
- Versioned specifications, release matrix and example of a treated exception.
- Sample
- Track an exception to the competent authority and the documented resumption of the standard.
- 2024/1774 Art. 2 (opens in new tab)
- Overview of the ICT risk framework
- Support index for repeatable test
DORA-A09-009
2024/1774 · Art. 6Technical test
Choose encryption by classification and risk assessment
Define the protection requirement per data processing and application. Choose, use and review appropriate cryptographic measures and deal with justified deviations.
- Testable evidence
- Classification reference, cryptographic directive and approved exemption.
- Sample
- Check a transmission path and a resting fuse for the rule applied.
DORA-A09-010
2024/1774 · Art. 7Technical test
Control keys over the entire life cycle
Track generation, storage, backup, rotation, blocking, recovery and destruction of relevant keys. Document loss or compromise as your own reaction case.
- Testable evidence
- Key registers with responsible persons, incident rules and change of record.
- Sample
- Compare the status and next maturity of a critical certificate with the key actually used.
DORA-A09-011
2024/1774 · Art. 8Technical test
Prove operational procedures and separation of environments
Set requirements for operation, fault handling, documentation and separation of relevant environments. Secure testing and approval of operational exceptions.
- Testable evidence
- Operating instructions and minutes of an approved amendment or exemption.
- Sample
- Compare development, testing and production using actual roles and release paths.
DORA-A09-012
2024/1774 · Art. 9Technical test
Evaluate capacity and performance proactively
Measure actual utilization, define acceptable limit values and plan capacity measures before reaching critical limits.
- Testable evidence
- Trend, comprehensible needs assessment and approved action decision.
- Sample
- Check utilization and response time in the peak window against available reserve and planned expansion.
DORA-A09-013
2024/1774 · Art. 10Technical test
Connecting Vulnerability Information and Your Behaviour
Process relevant internal and external information and check it against actual versions and exposed assets.
- Testable evidence
- Review journal with source, version concerned, deadline and responsible body.
- Sample
- Check a relevant new hint based on the inventory version and the documented decision.
DORA-A09-014
2024/1774 · Art. 10Technical test
Control regular vulnerability checks and prioritization
Document coverage, frequency, causes of deviations and treatment of findings after criticality and relevance to effects.
- Testable evidence
- Monitoring plan, verifiable results and assessed open weaknesses.
- Sample
- Select an asset that is relevant for critical functions and check the planned and actual audit.
DORA-A09-015
2024/1774 · Art. 10Technical test
Check, distribute and track exceptions
Link release, rollout proof and success control. Decisions on deferral or non-implementation need a well-founded and sustained status.
- Testable evidence
- Patch file with version soll, verification and compensation.
- Sample
- Check the distribution to a reasoned sample, including an earlier exempted installation.
DORA-A09-016
2024/1774 · Art. 11Technical test
Secure data processing and secure system configuration
Determine protection requirements for creation, processing, storage, transmission and deletion from the classification. Reject secure configuration and required exceptions.
- Testable evidence
- Protection matrix, reference configuration and verification of the actual system.
- Sample
- Check selected fields of a production dataset against actual memory and deletion rules.
- 2024/1774 Art. 11 (opens in new tab)
- Comparison of function and ICT stock
- Sample sheet for temporary authorisations
DORA-A09-017
2024/1774 · Art. 12Technical test
Control logging, time base and integrity
Document relevant events, protection of logs, storage and time synchronization. Set access, control and evaluation.
- Testable evidence
- Log rule, proof of time synchronization, unchanged event track and permission extract.
- Sample
- Compare time marks of the same incident on two systems involved.
DORA-A09-018
2024/1774 · Art. 13Technical test
Match network zones, rules and logical separation
Check segmentation, administration interfaces, protection of connections and regularly checked connection rules based on criticality.
- Testable evidence
- Network overview and verifiable verified rule set.
- Sample
- Prove that between two differently classified networks only the approved dependency exists.
DORA-A09-019
2024/1774 · Art. 13Technical test
Check network changes with service effect
Capture approved rule state and actual connections. Set revocation, monitoring and jurisdiction for exception paths.
- Testable evidence
- Network change file with findings and withdrawal criteria.
- Sample
- Check a temporary exception after the end of the period for continuity.
- 2024/1774 Art. 13 (opens in new tab)
- DORA test file for a memory change
- Sample sheet for temporary authorisations
DORA-A09-020
2024/1774 · Art. 14Technical test
Test Confidential and Integrous Transmission
Arrange transfers and remove access to a binding protection rule. Check encryption and protection against unauthorized transmission.
- Testable evidence
- Data flow and proof of verified transmission.
- Sample
- Compare a received file with shared target, label and integrity evidence.
DORA-A09-021
2024/1774 · Art. 15Technical test
Leading ICT projects with security and release points
Define project roles, targets, risk assessment, reporting and approval points. Include affected areas and controls in relevant changes.
- Testable evidence
- Project file with requirements, risk decision and commissioning review.
- Sample
- Check a project for documented safety decision before a significant production process.
DORA-A09-022
2024/1774 · Art. 16Technical test
Release development, procurement and maintenance loadable
Determine security requirements, environments, data usage and testing for developed or procured systems according to the relevant scope.
- Testable evidence
- Requirement, test proof, controlled transition and documented release.
- Sample
- Compare security requirements of a procured application with the actual decrease in status.
- 2024/1774 Art. 16 (opens in new tab)
- DORA test file for a memory change
- Worksheet for a risk-based test programme
DORA-A09-023
2024/1774 · Art. 16Technical test
Control test data and development access
Set protection rules for data and access in development and test environments, including justified exceptions.
- Testable evidence
- Data and access proof with an exception.
- Sample
- Compare the data content of a test copy with the permitted use and authorized storage.
DORA-A09-024
2024/1774 · Art. 17Technical test
Separate approval, execution and control of changes
Document triggers, tests, permits, execution and impact, including post-processing of urgent changes and relapse option.
- Testable evidence
- Version-related change record and result of the follow-up.
- Sample
- Repeat the sample to effect after an emergency change that has been subsequently checked.
- 2024/1774 Art. 17 (opens in new tab)
- DORA test file for a memory change
- Workbook for findings and follow-up tests
DORA-A09-025
2024/1774 · Art. 18Technical test
Cover physical and environmental hazards per site
Delegate physical protection and environmental controls from the importance of the systems supplied. Arrange location responsibility, access and test rhythm.
- Testable evidence
- Location risk assessment, proof of access and documented functional verification of protective measures.
- Sample
- Check the coverage of a shared electricity or climate supply.
- 2024/1774 Art. 18 (opens in new tab)
- Comparison of function and ICT stock
- Planning sheet for check dates and change announcements
DORA-A09-026
2024/1774 · Art. 19Technical test
Integrate ICT security into relevant personnel events
Arrange current obligations, roles and exits to a security process that makes responsibilities and relevant access changes verifiable.
- Testable evidence
- Exemplary roll change with adapted permission and confirmed information.
- Sample
- Compare role change, training needs and actual limitation of old permission.
- 2024/1774 Art. 19 (opens in new tab)
- Roll balancing for release and independent control
- Sample sheet for temporary authorisations
DORA-A09-027
2024/1774 · Art. 20Technical test
Manage unique identities and their status
Keep track of which person or service uses an identifier when and how the installation, modification and deletion have been authorized.
- Testable evidence
- Identity inventory with assignment and proof of a status change.
- Sample
- Check an administrative and a technical identity for comprehensible owners and use.
DORA-A09-028
2024/1774 · Art. 21Technical test
Implement minimal, temporary and verified accesses
Limit access to responsibility and need, control privileged rights and verify timely withdrawal.
- Testable evidence
- Certificate of eligibility with approval, lettreview, expiry date and withdrawal certificate.
- Sample
- Check if an access granted after the end of a practice has been removed.
DORA-A09-029
Questions from the practice of supervision
The answers explain the application in the context specified. Check the status and transferability to your facts on the basis of the linked reference.
ESA-Q&A2024_7178
Is a VLAN enough for the separate administrative network?
The standard does not define a single topology. Separation must be effective under the concrete risks, a VLAN alone can be insufficient.
For your implementation Reason the chosen separation and check permitted and forbidden administrative channels from a representative segment.
- Testable evidence
- Released network concept, proof of segmentation and results of permitted and rejected test paths.
- Sample
- Repeat a permissible administrative connection and a rejecting path from a user network.
Answers in the EBA Single Rulebook 1
Working aids for this Article
Certificate Change Test Sheet
Plan the exchange and check actual chain, residual term and usage through dependent services.
Outcome The change is removed with correct chain, validity, function and relapse option.
Read the instructions
Fictional example The new certificate is active on the primary service, a second end point reports only six days remaining. A side endpoint still presents the old certificate.
- Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Correct the affected endpoint and repeat functional, residual runtime and chain sample separately.
Capacity planning sheet
Measure capacity reserves and thresholds under representative peak and replacement loads.
Outcome Decision on the released load including bottleneck, early warning threshold and follow-up.
Read the instructions
Fictional example In a peak phase, the application processes 780 operations per minute. On the replacement path there are 610. 610 operations on the replacement path remain under the approved requirement.
- Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Determine the bottleneck and repeat the load test with unchanged profile after adjustment.
Findings and treatment decision for a safety update
Follow safety findings, maintenance-related deviation and correction until proven follow-up.
Outcome A reasoned patch or exception decision with a clear deadline and dependence.
Read the instructions
Fictional example A supplier patch cannot be recorded during billing. Replacement control is running for a limited time. The test is done, but the operating data shows an old version.
- Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Open the result again and secure version, risk decision and test on the same initial identifier.
Sample sheet for temporary authorisations
Check application, effective privilege and timely withdrawal on a version-bound case.
Outcome The rights sample combines approval, technical termination and evaluation of completed meetings.
Read the instructions
Fictional example A maintenance account receives temporary increased rights until 16:00. A follow-up test around 16:15 uses the same identity. Access is still possible after the expiration of another group.
- Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Also withdraw indirect access and document a re-examination of both paths.
DORA test file for a memory change
Before changing memory, set the initial level and the same criteria for first and second tests.
Outcome Acceptance file with reproducible time value, alarm and decision to change.
Read the instructions
Fictional example The first run allows access after 85 minutes, but the expected alarm is missing. 85 minutes alone do not prove successful technical and professional acceptance.
- Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Document two separate results and test the alarm delivery after correction with the same conditions.
Overview of the ICT risk framework
Arrange guidelines, controls, independent audit and reports to the same framework.
Outcome A versioned framework documentation combines risk target, implemented control and periodic efficacy test.
Read the instructions
Fictional example The management approves a new risk cap for ICT operations. The test program continues to refer to the old target version.
- Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Determine the effective status, correct the reference and prove the application of the new limit in the plant.
Support index for repeatable test
Create a repeatable index that holds together target criterion, sample, source and responsible rating.
Outcome A second person may re-examine the examination without additional knowledge using the same referenced files.
Read the instructions
Fictional example A test protocol refers to a log extract whose file name remained unchanged after filing while the version was updated. The log proof shows the status instead of during the checked time window.
- Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Secure the original version and keep the results up to approved release.
Comparison of function and ICT stock
Control the actual functional and system reference against inventory and department.
Outcome Missing or duplicate relationships are listed as concrete findings with system evidence.
Read the instructions
Fictional example The payment service is based on the application PAY-A and the key service KEY-07. KEY-07 is missing after a technical migration from the target inventory.
- Is to compare and Insert independent target and actual lists as text. Declare missing, duplicated and additional identifiers.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Clarification and responsibility from the system change take over and after correction compare both inventory levels.
Alarm delivery test protocol
Check alarm, transmission route and processing with specifically triggered test signals.
Outcome The time and delivery sample shows alarm cause, receiver, escalation and proven fix.
Read the instructions
Fictional example During a controlled test, a memory error creates an event. The primary channel is silent unplanned. In the event system there is an alarm, with the receiver no confirmation is available.
- Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Follow delivery and escalation after correction with unchanged test signal and independent time source.
Decision on ICT risk
Calculate inherent and remaining internal risk values and document the authorised treatment.
Outcome Risk decision with assumptions, residual risk limit, effective measure and resubmission.
Read the instructions
Fictional example A central service has no alternative entry 4 and impact 5. With tested replacement the entrance drops to 2. For impact 5, the reliable expert evaluation is missing.
- Compare residual risk Evaluate the occurrence and impact of each scenario before and after the treatment, on the same internal scale.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Keep the findings open, check the extent and dependence and release the assumptions by the competent authority.
Worksheet for a risk-based test programme
Determine samples from the risk and determine the scheduled date, additional test and supporting documents required for acceptance.
Outcome A risk-based test plan shall contain fully verifiable test items, dates, findings and follow-up tests.
Read the instructions
Fictional example The regular program tests the payment input and output. After an infrastructure change, an additional restart test is required. The memory change does not have a scheduled restart test.
- Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Set an event-related test and secure release, results and deviations after completion.
Workbook for findings and follow-up tests
Control remedial, retest, residual deviation and completion per unique finding.
Outcome Final findings have a comprehensible follow-up test under the same relevant criterion.
Read the instructions
Fictional example In the first test, an event is not escalated. The second test only confirms internal logging. The result was closed before confirmation of alarm delivery.
- Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Open the test and re-examine the observed result for the same criterion.
Planning sheet for check dates and change announcements
Connect the rule date and event trigger to the same responsibility and check failed execution.
Outcome A list of events leads from the occasion to test reports and independent monitoring of the effect.
Read the instructions
Fictional example The annual plan includes a restore test, an infrastructure change shifts the risk level earlier. The annual test is still considered to be up-to-date, although the platform has changed.
- Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Capture the additional test regardless of the year and track the due date until the documented completion.
Roll balancing for release and independent control
Adjust decision, implementation and independent control based on roles and actual access routes.
Outcome A role sample shows who performs a concrete change, releases it and independently assesses it.
Read the instructions
Fictional example The operator can prepare a change. His representation has identical system permissions. In the sample, the same person confirmed implementation and independent verification.
- Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Unbundle the roles and repeat the permission and clearance test with personal representation.
Other official references3
- ICT risk management and simplified framework (opens in new tab)
RTS · 2024/1774
Title II sets out the regular ICT framework. Title III sets out the requirements for the institutions referred to in Article 16.
- BaFin overview of DORA documentation requirements (opens in new tab)
Supervision advice · 2022/2554 and technical standards
Compare regular evidence by subject with the specific legal bases. Check your own validity and especially addressed regulations separately.
- Common questions and answers from European supervisory authorities (opens in new tab)
Supervisory portal · ESAs · Joint Q&A Register
Check the publication status, legal reference and current answer in the joint register. Paper and technical questions for submission are available in our own sources.
Editorial update 2026-11-28 · Geltende Fassung und Zuständigkeit anhand der amtlichen Fundstelle prüfen.
Find the provisions relevant to your task
Select the task to be solved. The location and the practical audit trail lead each to the appropriate destination.
Who's on the map?
Start with the legally proven status. In a second step, clarify the risk framework and other obligations.
- Acceptance criterion
- For each entity, record the activity and legal reference supporting applicability. Use the assessment date.
- Evidence
- Test record with transaction, expected business result, observed effect and finding decision.
How is the frame supported?
Use a business performance as a sample. The framework must be comprehensible up to the valid procedure and the responsible role.
- Acceptance criterion
- Trace the requirement for a business service to the current procedure and responsible role.
- Evidence
- Roles record naming responsibilities, deputies and documented approval or escalation.
When will a malfunction become a report case?
Document observation, classification and dispatch based on their own time records.
- Acceptance criterion
- Place awareness, classification and dispatch evidence on a timeline. Review events against a common time basis.
- Evidence
- Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.
How is the effectiveness tested?
Link test scope, applicable requirements and verifiable remedy.
- Acceptance criterion
- Assign an observable business objective to the test. A finding needs documented remediation and a comparable retest.
- Evidence
- Reasoned applicability assessment recording facts, reference, role, date and open assumptions.
What follows from the reference of an ICT service?
Use the specific performance as a starting point. In addition, check the meaning of the supported function.
- Acceptance criterion
- Link the service used and function supported to the service schedule and corresponding operational evidence.
- Evidence
- Agreement reconciliation linking the service, current clause, operating evidence and decision on any discrepancy.
Understand the rule in your own case
Select a legal entity, function and task. Determine relevant articles, responsible role and practical proof in one line.
Test criterion Another person can find the request and the accompanying document on the basis of your note.
Official sources
First check for this task
DORA · Art. 2 · Applicability
Article 2 lists the categories and exceptions concerned.
For your exam Check the status and activity of the entity.
DORA · Art. 6 · ICT risk management
The rule sets out documentation, risks, review and strategy.
For your exam Combine technical impact and operational control.
DORA · Art. 17–19 · Incidents and reporting
The regulations deal with incident process, classification and reporting.
For your exam In a case, determine the time base, service and jurisdiction concerned.
Other official references3
- DORA · Art. 24–27 · Tests (opens in new tab)
EUR-Lex · Amtliche Fundstelle
The test chapter covers general tests and special requirements for threat-oriented tests.
For your exam Check which test approach and which responsibility are relevant.
- DORA · Art. 28–30 · Third party (opens in new tab)
EUR-Lex · Amtliche Fundstelle
The rules combine risks, information registers and contract requirements.
For your exam Follow an agreement from purchase to service and function.
- Regulation (EU) 2022/2554 · Complete official version (opens in new tab)
EUR-Lex · Amtliche Fundstelle
Official source text for validity, requirements and supervision.
For your exam Read the relevant article with its paragraphs and definitions.
What is the next decision?
Deepen the concrete work path with a sample. In the DORA legal register you will find the neighbouring sources if the decision touches another standard.
DORA Register
The source path leads from validity and risk framework to reporting procedures, information registers and resilience tests. For each reference point you will find out what it is needed for.
Determine the DORA treatment for a legal entity
Registration or registration certificate, actual performance description, organizational chart and list of participations.
Arrange the legal person and his actual activity. A note per legal entity combines authorisation or registration, possible exceptions, the applicable risk framework and the competent authority.
Work result The validity mark with the category checked, status certificate, framework and trigger of re-examination.
Your result Decision-making endorsement with source of authorisation, activity, result, open points and link to the information register.

