CRA · IMPLEMENTATION GUIDE

Design the test programme and sample

Plan recurring checks and change events.

PRODUCT
CONFORMITY
MAINTENANCE

What you decide and prove

Set a risk-based test program for the actual product stock. The decisive factors are the observable protective effect, relevant variants, the test conditions and the next occasion. In addition, agree on who will respond to a finding.

Annex I, Part II, No 3 requires regular and effective tests and checks. Transfer the requirement to appropriate intervals and changes of the own product. Internal sample numbers are based on variants and risks.

After the run, face planned and actually tested groups. A success rate describes the samples performed. Whether the sample supports the release depends on whether the decisive groups were actually recorded.

Edit the test step by step

  1. Establishing the actual product groups

    Determine three depot profiles, the test environment and the common criterion for warning.

    Testable evidence Sampling plan with unique group key.

    Acceptance criterion
    Record the variant represented by each depot profile and agree the warning criterion before testing.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.
  2. Compare planned and actual coverage

    Open the source documents. Arrange the six valid observations to the two tested profiles.

    Testable evidence Covered by two of the three groups.

    Acceptance criterion
    Assign each raw observation to the profile actually tested. Keep the third profile open until the supplementary test.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.
  3. Check the missing group and document rhythm

    Perform three appropriate samples at Depot South. Keep in mind the change to be re-examined and who confirms the decisions.

    Testable evidence Valid supplement sample and dated resubmission.

    Acceptance criterion
    Check Depot South against the same warning criterion. Retain the evidence with the trigger for a future repeat test.
    Evidence
    Evidence list recording original source, version, documented mapping and owner.

All six tested devices pass and a depot missing in the sample

One manufacturer checks networked warehouse monitors for three depots. Each depot uses a different shared connection profile. The device selection in the test plan comprises three units per depot. The same documented warning sequence is decisive.

The sample consists of three units each from Depot Nord and Depot Mitte. For Depot Süd, a set of Depot Mitte was also accidentally provided, which is identified on the basis of the delivery list. Therefore, no valid sample is available for Depot Süd.

What you'll find out in the case

Test plan with proven group coverage and clearly identified gap.

Editing the Practice Case

Templates and worksheets

  • Sample per product profile and series

    Compare planned quantities, actual valid samples and passed cases per delivery profile.

    Outcome Tested sample size with open profiles and scheduled repetition.

    Read the instructions

    Fictional example Six out of six samples are in place.

    1. Identify the starting situation Deriving groups and occasions from product and delivery stock.
    2. Run the test Determine the validity and result per group.
    3. Secure decision and evidence Sample open profiles in the affected line or environment.

Official sources

What depends on your result?

  • Ensure conformity in series production

    The different profile comes from another production line. Check the actual delivery level on this line.

    View the guide