CRA · CASE STUDY

A new module in an approved type

A new component touches the approved type.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

A manufacturer of a fictitious Class I product uses the way out of Module B and C in his case. For Version 5.0, there is a certificate. With Version 5.1, the team changes the module for testing update release.

For version 5.1, all agreed internal scenarios are fulfilled after the test. The change may affect the approved conditions and has already been notified to the competent body. Additional approval confirmed for 5.1 is not yet available at the time of the exercise.

Compare test data and consequences

  • Type

    Scale
    Certificate for the delivery
    Observation
    Previously on 5.0
    Follow
    Clear the addition for 5.1
  • Internal post-test

    Scale
    Expected product impact
    Observation
    The scenarios tested were passed
    Follow
    Technical proof available
  • Serial release

    Scale
    Right type and documented production
    Observation
    Approval open for 5.1
    Follow
    Reset Delivery

The reference status of the type certificate

Internal test for 5.1. The certificate so far concerns 5.0. The series for 5.1 needs the approval and its own production certificate.
Internal test for 5.1. The certificate so far concerns 5.0. The series for 5.1 needs the approval and its own production certificate.

Arrange internal test, additional approval and serial conformity to the same target.

Edit the test step by step

  1. Determine the scope of the original certificate

    Compare version, risks, conditions and functions affected by the new situation.

    Testable evidence A verified description of the change with a clearly defined scope.

    Acceptance criterion
    Justify applicability using evidenced activity or intended use, role and date. Assign an owner and due date to any unresolved assumption.
    Evidence
    Reasoned applicability assessment recording facts, reference, role, date and open assumptions.
  2. The required approval will lead to the target

    Secure the notification, material and response of the competent authority. Determine a necessary supplement separately.

    Testable evidence The additional approval is comprehensible.

    Acceptance criterion
    Trace the decision to the agreed requirement and observed result. Assign an owner and review date to open conditions.
    Evidence
    Decision record with requirement, result, evidence references, approval status and dates for open items.
  3. Connect tested type and actual series produced

    Arrange the confirmed version to the production documents. Capture which units represent the actual approved status.

    Testable evidence Release decision per delivery stand with supporting documents for modules B and C.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.

Worked decision and negative test

Decision in case

The internal examination proves the examined scenarios in 5.1. The necessary additional approval for the modified type is still open in the sample.The production release remains limited to the confirmed scope.

Secure the evaluated amendment, confirmation of the notified body and actual serial reference. The three steps need to be combined versions in the file.

Counter-sample and impact

Complete the additional approval for 5.1, but have a different old building block shown in production. The certificate is available. The conformity of the actual series remains open until correction.

Audit record
Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.

Templates and worksheets

  • Standard coverage and type level

    Track standard reference, actual application, procedural gap and confirmed scope of the type.

    Outcome Evidence per requirement and release status of the appropriate assessment method.

    Read the instructions

    Fictional example Six out of nine requirements are covered by the approved standard version.

    1. Identify the starting situation Confirm the official basis and actual edition.
    2. Run the test assess coverage and the necessary complementary procedure.
    3. Secure decision and evidence Check the certificate and the actual delivered stand.

Official sources

What depends on your result?

  • Clear type modification with notified body

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Ensure conformity in series production

    Check whether the documented delivery actually depicts the confirmed type.

    View the guide