DORA · LEGAL SOURCES

DORA article register

Find the relevant DORA article and follow it to practical checks and supporting evidence.

SOURCE
APPLICATION
EVIDENCE

Determine the relevant articles for your business task

Regulation (EU) 2022/2554 regulates digital operational resilience in the financial sector. The following entry points lead from the applicable legal framework to the appropriate work page.

First, select a legal entity and a single business task. For a related restoration service, check the documented function, contract reference and test receipt. Determine which part of the decision is covered by the basic act and what question you are looking up in the specific standard.

DORA · Article Register

Art. 16 · Implement the simplified ICT framework independently

Conditional obligation Management body and ICT responsibility in designated facilities

The simplified framework applies to the explicitly mentioned categories. Additional DORA chapters are to be assessed separately per institution.

Test points for basic article

Art. 16 1 1st subparagraphConditional obligation

Determine eligibility for the simplified framework

Support legal category and, if necessary, exceptional status or size feature. Document the remaining obligations outside of Articles 5–15.

Testable evidence
Application decision with technical documentation and list of further relevant chapters.
Sample
Check a size change and its impact on frameworks, registers and reporting process.

DORA-A16-001

Art. 16 Paragraph 1(a)Conditional obligation

Decision on simplified frameworks with responsibility

Document decisions, protection of physical components, ICT risk process and responsibilities. Take on frameworks and controls in the operational work.

Testable evidence
Released frame with roles and prioritized controls.
Sample
Track a material ICT risk from the frame to the backup document.

DORA-A16-002

Art. 16 Paragraph 1 (b)–(c)Conditional obligation

Continuous monitoring of system status and protection

Perform appropriate inventory and operational monitoring, keep tools up to date and check protection and safe accesses.

Testable evidence
Inventory, monitoring reports and proof of control for a relevant system.
Sample
Check a system without current maintenance for exception, risk and remedy.

DORA-A16-003

Art. 16 Para. 1 point e–fConditional obligation

Main dependencies and continuity

Identify essential external ICT dependencies. Stand by for critical or important functions continuity, backup and back-up procedures.

Testable evidence
Dependence card as well as current continuation and restore protocol.
Sample
Check a critical outsourced function until technical data is collected.

DORA-A16-005

Art. 16 Paragraphs 2–3Conditional obligation

Document regular and event-related framework testing

Involve serious incidents and supervisory instructions. Prepare a comprehensible report for a government request.

Testable evidence
Review report with changes, priorities and source status.
Sample
Choose a serious incident and check the reasons for the follow-up.

DORA-A16-007

Specific technical requirements

2024/1774 · Art. 29Technical test

Making Simplified Safety Requirements Workable

Gather appropriate information security measures with concrete scope, responsibility and verifiable implementation.

Testable evidence
Released specifications and application in a delimited service.
Sample
Check whether an exception is released and assigned to the affected asset.

DORA-A16-009

2024/1774 · Art. 30Technical test

Classify information and ICT assets in a simplified framework

Arrange assets according to criticality, protection needs and meaning of the supported functions. Keep up to date.

Testable evidence
Inventory with assignment and responsible protection requirements.
Sample
Compare protected data and competent system to a specific service.

DORA-A16-010

2024/1774 · Art. 31Technical test

Document risk management and residual risk in a simplified framework

Merge risks, valuation, measures and remaining risk in a comprehensible manner. Synchronise reassessment and changes.

Testable evidence
Risk register with decisions and control documents.
Sample
Check for an accepted risk of effective balancing control.

DORA-A16-011

2024/1774 · Art. 32Technical test

Check physical safety in simplified design

Arrange the supply and access protection to the actual premises and facilities used.

Testable evidence
Location note and control sample carried out.
Sample
Check an access point and the effect of its failure on the specialist performance.

DORA-A16-012

2024/1774 · Art. 33Technical test

Prove access control in a simplified framework

Arrange logical and physical accesses to specific tasks. Set installation, check and withdrawal in demonstrable procedures.

Testable evidence
Permission extract with assignment and verified sample.
Sample
Compare an old roll with the remaining rights after changing.

DORA-A16-013

2024/1774 · Art. 34Technical test

Practically check ICT operation and anomaly treatment

Set up continuous system monitoring and appropriate operational measures. Pair logging, deviance treatment and system maintenance.

Testable evidence
Business journal with case from monitoring and documented reaction.
Sample
Check the actual alarming and response in a failed operation job.

DORA-A16-014

2024/1774 · Art. 35Technical test

Protect data, systems and networks in a simplified framework

Apply appropriate technical protection measures according to the need for protection. Arrange them to the specific data flow or system.

Testable evidence
Protection matrix with documented configuration and verification.
Sample
Compare a network connection with the shared data and access rules.

DORA-A16-015

2024/1774 · Art. 41Technical test

Keeping the review report for the simplified framework to be filled

Arrange events, vulnerabilities, changes and follow-up steps to the relevant reporting components. Embark version and release.

Testable evidence
Retrieveable report with a clear reference period and installations.
Sample
Re-create the version of an earlier review from the sources you received.

DORA-A16-021

Questions from the practice of supervision

The answers explain the application in the context specified. Check the status and transferability to your facts on the basis of the linked reference.

Supervision adviceBaFin-Rahmen16

How will the decision for the simplified framework be proven?

BaFin explains the requirements for simplified ICT risk management. The underlying Art. 16 status and additional requirements are to be determined per entity.

For your implementation Link the validity certificate, Title III of the technical specification and respective internal binding. Check the separate remaining obligations.

Testable evidence
Framework note with status, scope and reference to further applicable requirements.
Sample
Check a legal entity with a simplified framework and its separately documented register obligation.
Answers in the EBA Single Rulebook 1

Working aids for this Article

  • DORA Scope and management decision

    Merge legal entities, relevant category, exceptions and the decision of the management body in one transaction.

    Outcome A management decision shall be valid and shall set out the open test requirements separately.

    Read the instructions

    Fictional example An approved bank uses an internal company IT operation. The company of the IT enterprise does not conclude its own banking contracts. For the group IT the audited service description is missing.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Keep the role of the service company open, resubmit and document the bank's decision separately.
  • Proportionality note

    Reason the depth of control per business model, size, complexity and proven dependence.

    Outcome A verifiable proportionality note with alternatives and reassessment occasions.

    Read the instructions

    Fictional example A small investment firm operates a business-critical external identity service. A flat-rate size note underestimates an unreplaceable platform.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Evaluate the specific function, examine the simplified framework separately and set the resubmission.
  • Overview of the ICT risk framework

    Arrange guidelines, controls, independent audit and reports to the same framework.

    Outcome A versioned framework documentation combines risk target, implemented control and periodic efficacy test.

    Read the instructions

    Fictional example The management approves a new risk cap for ICT operations. The test program continues to refer to the old target version.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Determine the effective status, correct the reference and prove the application of the new limit in the plant.
  • Planning sheet for check dates and change announcements

    Connect the rule date and event trigger to the same responsibility and check failed execution.

    Outcome A list of events leads from the occasion to test reports and independent monitoring of the effect.

    Read the instructions

    Fictional example The annual plan includes a restore test, an infrastructure change shifts the risk level earlier. The annual test is still considered to be up-to-date, although the platform has changed.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Capture the additional test regardless of the year and track the due date until the documented completion.
  • Comparison of function and ICT stock

    Control the actual functional and system reference against inventory and department.

    Outcome Missing or duplicate relationships are listed as concrete findings with system evidence.

    Read the instructions

    Fictional example The payment service is based on the application PAY-A and the key service KEY-07. KEY-07 is missing after a technical migration from the target inventory.

    1. Is to compare and Insert independent target and actual lists as text. Declare missing, duplicated and additional identifiers.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Clarification and responsibility from the system change take over and after correction compare both inventory levels.
  • Decision on ICT risk

    Calculate inherent and remaining internal risk values and document the authorised treatment.

    Outcome Risk decision with assumptions, residual risk limit, effective measure and resubmission.

    Read the instructions

    Fictional example A central service has no alternative entry 4 and impact 5. With tested replacement the entrance drops to 2. For impact 5, the reliable expert evaluation is missing.

    1. Compare residual risk Evaluate the occurrence and impact of each scenario before and after the treatment, on the same internal scale.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Keep the findings open, check the extent and dependence and release the assumptions by the competent authority.
  • Sample sheet for temporary authorisations

    Check application, effective privilege and timely withdrawal on a version-bound case.

    Outcome The rights sample combines approval, technical termination and evaluation of completed meetings.

    Read the instructions

    Fictional example A maintenance account receives temporary increased rights until 16:00. A follow-up test around 16:15 uses the same identity. Access is still possible after the expiration of another group.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Also withdraw indirect access and document a re-examination of both paths.
  • Alarm delivery test protocol

    Check alarm, transmission route and processing with specifically triggered test signals.

    Outcome The time and delivery sample shows alarm cause, receiver, escalation and proven fix.

    Read the instructions

    Fictional example During a controlled test, a memory error creates an event. The primary channel is silent unplanned. In the event system there is an alarm, with the receiver no confirmation is available.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Follow delivery and escalation after correction with unchanged test signal and independent time source.
  • Certificate Change Test Sheet

    Plan the exchange and check actual chain, residual term and usage through dependent services.

    Outcome The change is removed with correct chain, validity, function and relapse option.

    Read the instructions

    Fictional example The new certificate is active on the primary service, a second end point reports only six days remaining. A side endpoint still presents the old certificate.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Correct the affected endpoint and repeat functional, residual runtime and chain sample separately.
  • Worksheet for a risk-based test programme

    Determine samples from the risk and determine the scheduled date, additional test and supporting documents required for acceptance.

    Outcome A risk-based test plan shall contain fully verifiable test items, dates, findings and follow-up tests.

    Read the instructions

    Fictional example The regular program tests the payment input and output. After an infrastructure change, an additional restart test is required. The memory change does not have a scheduled restart test.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Set an event-related test and secure release, results and deviations after completion.
  • Workbook for findings and follow-up tests

    Control remedial, retest, residual deviation and completion per unique finding.

    Outcome Final findings have a comprehensible follow-up test under the same relevant criterion.

    Read the instructions

    Fictional example In the first test, an event is not escalated. The second test only confirms internal logging. The result was closed before confirmation of alarm delivery.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Open the test and re-examine the observed result for the same criterion.
  • DORA test file for a memory change

    Before changing memory, set the initial level and the same criteria for first and second tests.

    Outcome Acceptance file with reproducible time value, alarm and decision to change.

    Read the instructions

    Fictional example The first run allows access after 85 minutes, but the expected alarm is missing. 85 minutes alone do not prove successful technical and professional acceptance.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Document two separate results and test the alarm delivery after correction with the same conditions.
  • Test sheet for the selection of an ICT provider

    Compare the pre-test of service, ability, risks, replaceability and document access.

    Outcome The selection decision can be understood by proven risk factors, alternatives and effective conditionality.

    Read the instructions

    Fictional example Two providers meet the SLA. One does not provide data on the sub-service for restarting. The lower cost provider cannot evaluate the replacement.

    1. Compare residual risk Evaluate the occurrence and impact of each scenario before and after the treatment, on the same internal scale.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Secure the missing information before release and check the instructed remedy and alternative.
  • Protocol of a crisis communication exercise

    Test internal and external communication for a specific failure including failed primary channel.

    Outcome A time log shows achievable recipients, shared content and a functional replacement path.

    Read the instructions

    Fictional example The primary mailbox is not accessible in the exercise. Two recipients confirm the replacement route after 7 and 18 minutes. A recipient receives the message only after 18 minutes.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Hold the delayed path. Repeat the test after updating the contact chain.
  • Business Impact Analysis Worksheet

    Evaluate the effects on time and dependencies using specific company data.

    Outcome A well-founded restart priority with function dependence and a comprehensible time threshold.

    Read the instructions

    Fictional example Payment processing depends on the booking service, which is planned in the previous priority register later. The planning has led to the booking dependence only as a general IT service.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Change order and scenario and confirm the actual transition from the subject page.
  • Measurement protocol for a back-up

    Compare time to the technical usability, effective data level and sampled scope.

    Outcome RTO and RPO are calculated separately and associated with the technical release.

    Read the instructions

    Fictional example The restart target is 90 minutes, tolerated data loss 15 minutes. The run takes 105 minutes, data level 8 minutes before failure. RTO is exceeded by 15 minutes, the RPO is maintained.

    1. Restart and check data Capture restart target, data level, completeness and technical release separately.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Document the separate results. Make a cause clarification and a follow-up test with an unchanged scale.
  • Acceptance protocol for a recovered data set

    Compare recovered data volume, completeness and known test records with the reference level.

    Outcome A data collection protocol shows number and type of missing entries, time target and responsible release.

    Read the instructions

    Fictional example After recovery, 9,998 of the 10,000 expected booking records are present and the recovered data meets the recovery point objective. The two missing records have neither been excluded nor reconstructed.

    1. Restart and check data Capture restart target, data level, completeness and technical release separately.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Stop the acceptance, determine the gap by reference and secure the retest after data correction.
  • Support index for repeatable test

    Create a repeatable index that holds together target criterion, sample, source and responsible rating.

    Outcome A second person may re-examine the examination without additional knowledge using the same referenced files.

    Read the instructions

    Fictional example A test protocol refers to a log extract whose file name remained unchanged after filing while the version was updated. The log proof shows the status instead of during the checked time window.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Secure the original version and keep the results up to approved release.
  • DORA register of information Verification Report

    Check the expected registry positions separately from technical validations and technical approval.

    Outcome The submission can be restored including exception, correction and independent retest.

    Read the instructions

    Fictional example The export tests all contract IDs. An examiner also examines the connection between contract, service and function. C-074 is available but is assigned to a replacement function without any technical documentation.

    1. Is to compare and Insert independent target and actual lists as text. Declare missing, duplicated and additional identifiers.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Separate the formal acceptance from the technical findings. Secure the changed link and the re-export.
  • Workbook for matching the register stock

    Compare separate target and actual lists and capture missing, additional and multiple identifiers.

    Outcome The register stock is matched with source document, correction and retest per identifier.

    Read the instructions

    Fictional example A source stock contains C-001, C-002 and C-074. The prepared register export contains C-001 and C-002 double. C-074, C-002 is double and C-999 appears without source.

    1. Is to compare and Insert independent target and actual lists as text. Declare missing, duplicated and additional identifiers.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Clear all three findings separately. Run the list reconciliation after corrected export with the same target data.
  • Applicability of the Directive by legal entity

    Keep a reference date-based application note with activity, competence and decision by legal entity.

    Outcome A subsequent examination shall be carried out in the same category, the same exceptional examination and the same supporting evidence.

    Read the instructions

    Fictional example In a group, banks, insurance intermediaries and IT service companies are legally separate. Bank approval is mistakenly used as an application document for the service company.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Reorder the supporting documents and keep separate the exceptions and contractual roles.
Other official references8

Editorial update 2026-11-28 · Geltende Fassung und Zuständigkeit anhand der amtlichen Fundstelle prüfen.

Find the provisions relevant to your task

Select the task to be solved. The location and the practical audit trail lead each to the appropriate destination.

Who's on the map?

Start with the legally proven status. In a second step, clarify the risk framework and other obligations.

Acceptance criterion
For each entity, record the activity and legal reference supporting applicability. Use the assessment date.
Evidence
Test record with transaction, expected business result, observed effect and finding decision.

How is the frame supported?

Use a business performance as a sample. The framework must be comprehensible up to the valid procedure and the responsible role.

Acceptance criterion
Trace the requirement for a business service to the current procedure and responsible role.
Evidence
Roles record naming responsibilities, deputies and documented approval or escalation.

When will a malfunction become a report case?

Document observation, classification and dispatch based on their own time records.

Acceptance criterion
Place awareness, classification and dispatch evidence on a timeline. Review events against a common time basis.
Evidence
Copy of the submitted version with version reference, dispatch evidence, acknowledgement and outstanding items.

How is the effectiveness tested?

Link test scope, applicable requirements and verifiable remedy.

Acceptance criterion
Assign an observable business objective to the test. A finding needs documented remediation and a comparable retest.
Evidence
Reasoned applicability assessment recording facts, reference, role, date and open assumptions.

What follows from the reference of an ICT service?

Use the specific performance as a starting point. In addition, check the meaning of the supported function.

Acceptance criterion
Link the service used and function supported to the service schedule and corresponding operational evidence.
Evidence
Agreement reconciliation linking the service, current clause, operating evidence and decision on any discrepancy.

Understand the rule in your own case

Select a legal entity, function and task. Determine relevant articles, responsible role and practical proof in one line.

Test criterion Another person can find the request and the accompanying document on the basis of your note.

Official sources

First check for this task

Other official references3

What is the next decision?

Deepen the concrete work path with a sample. In the DORA legal register you will find the neighbouring sources if the decision touches another standard.

DORA Register

The source path leads from validity and risk framework to reporting procedures, information registers and resilience tests. For each reference point you will find out what it is needed for.

Determine the DORA treatment for a legal entity

Registration or registration certificate, actual performance description, organizational chart and list of participations.

Arrange the legal person and his actual activity. A note per legal entity combines authorisation or registration, possible exceptions, the applicable risk framework and the competent authority.

Work result The validity mark with the category checked, status certificate, framework and trigger of re-examination.

Your result Decision-making endorsement with source of authorisation, activity, result, open points and link to the information register.