NIS2 legal register
Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.
IMPLEMENTATION
EVIDENCE
Which legal area answers the question?
For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.
NIS2 · Standards Register
Annex No 6 · (EU) 2024/2690 · Procurement, development and maintenance
Addressee Types of providers and their services explicitly identified
Check the safety in selecting, changing, maintaining and controlled removal of a system under the relevant rule of the Annex.
Measures, evidence and sampling
Annex 6NIS2-DVA06-001
Link maintenance release and safety record
Determine tested version, responsibility and proof for secure procurement, development or maintenance. Keep track of vulnerabilities in their life cycle.
- Testable evidence
- Change log with configuration and function sample.
- Sample
- Track a replaced system component for documented release and its effectiveness control.
Annex 6NIS2-DVA06-002
Insert operational base positions into the test
Arrange approved configurations, inventory systems, patch decisions and documented exceptions to the service.
- Testable evidence
- Version and deviation proof with follow-up and next date.
- Sample
- Compare a currently maintained system and a justified temporary exception system.
6.5.2NIS2-WIR-003
Deriving the tested components from risk
Document procedures, scope, frequency, tested components and results according to the applicable technical specification. Connect with the performance actually affected.
- Testable evidence
- Test plan, selected component list and assigned results per test determination.
- Sample
- Compare the list of components relevant to safe operation with the demarcated sample, including justified exceptions.
Annex No 6 · (EU) 2024/2690NIS2-ARB-046
Prioritize weaknesses after personal concern
Match maintained components and the actual operating status with the manufacturer's notice. Also record service provider systems with proven contract reference. Separate confirmed, excluded documented and open occurrences. Evaluate delivery limit, business impact and existing protection for the concrete expression. Give date and responsibility. Link a provisional measure with effect and expiration. Compare released and observed status after the change. Confirm the function of the service and collect unexplained remaining assets separately.
- Testable evidence
- The inventory shows which occurrences are processed, how temporary measures are controlled and what test result can lead to closure.
- Sample
- Remove the version receipt of the excluded server. The result changes to "open" until the exact operating status is reached.
Annex No 6 · (EU) 2024/2690NIS2-ARB-047
Prove security updates to the full target stock
Determine devices or instances with confirmed concern. Secure receipts and identifiers, so that exchange and decommissioning remain traceable. Evaluate installation and operation records separately. Determine whether a restart, change of active node or withdrawal has changed the observed status. Confirm the preliminary measure and its date if exceptions are made. Perform a professional test and check open systems.
- Testable evidence
- The operation can show per system whether the target level is reached, comprehensiblely excluded or still open. A technical test confirms the effect on the performance performed.
- Sample
- Set a affected machine as closed. Connect the correction of the denominator to a proven shutdown and a confirmed inventory change.
Annex No 6 · (EU) 2024/2690NIS2-ARB-049
Check released connections and segment boundaries
Determine zones, data flow, operational responsibility and the professional reason for each released relationship. Select a technically unauthorized, clearly controlled counter-relationship. Compare the released status with the configuration and log records provided by the operation. Confirm only approved synthetic connection cases under supervision. Check whether the sample also concerns evasive operation and administrative paths. Limit your statement to the tested design and plan the follow-up test in case of changes.
- Testable evidence
- The proof includes the expected communication, the confirmed restriction and the impact on performance. The sample is reworkable to an approved extent and under operational supervision.
- Sample
- Delete the counter-test to replacement operation from the test scope. Evaluate which statement about the limit is still technically viable.
Related provisions
Other official references2
- Technical implementation assistance to the implementing regulation (opens in new tab)
ENISA · Technical Implementation Guidance, June 2025
Use examples of evidence and assignments for testing. The benchmark for the binding requirement remains the relevant legal act.
- Technical requirements and criteria for relevance (opens in new tab)
Implementing Regulation (EU) 2024/2690 · EUR-Lex
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.
Acts and official implementing aids
First check for this task
BSI Act as amended
Check the German obligation for the actual activity performed, the legal entity and the relevant time.
NIS2 Directive
The European framework shall explain the origin of the duties and tasks of Member States, authorities and bodies.
Technical requirements and criteria for relevance
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
Other official references1
- Technical implementation assistance to the implementing regulation (opens in new tab)
ENISA · Technical Implementation Guidance, Juni 2025
Use examples of evidence and assignments for testing. The benchmark for the binding requirement remains the relevant legal act.
Checking or preparing your own proof
State of change
A change in the legal situation is to be included in the audit order.
Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.
Work result The amendment note shows when and how it was reviewed.
Templates and worksheets
They want to collect their own data and capture a verifiable result.
Use calculated work aids to process classification, implementation, reporting deadlines and evidence.

